BLD-Final | 10/13/2008 | 10/14/2008 | 10/14/2008 | P | PASS |
Dave Hannah
|
|
|
matt Phone #: ###-####
|
DOC - Permit Finaled | 10/14/2008 | 10/14/2008 | 10/14/2008 | P | PASS |
Dave Hannah
|
|
|
|
FIRE-Final Inspection | 10/13/2008 | 10/14/2008 | 10/14/2008 | A | PASS |
Forrest France
|
|
|
Items on correction notice have been completed, existing vault okayed per fire chief with provision of the alternative automatic fire-extinguishing system- IFC 903.3.1.1.1, and 904.2.
|
BLD-Final | 10/9/2008 | 10/10/2008 | 10/13/2008 | P | NR |
Dave Hannah
|
|
|
Matt Phone #: ###-#### needs fire finals
|
FIRE-Final Inspection | 10/9/2008 | 10/10/2008 | 10/10/2008 | A | CANC |
Troy Cobbley
|
|
|
To be rescheduled for monday and also needs the sprinkler permit called in for a final inspection.
|
FIRE-Final Inspection | 5/21/2008 | 5/22/2008 | 5/22/2008 | A | PART |
Forrest France
|
|
|
Fire life safety final pending project related fire sprinkler work at the vault or compliance with IFC 2006 903.3.1.1.1 for exempt locations, also noted one EM light at the back exit hallway from the restrooms to be repaired and address number 510 posted on the correct doorway as discussed.
5/28/2008 - D. Hanneman denied a written request from the building owner to omit sprinkelrs from this vault. The Code does not exempt sprinklers in such spaces. (SLR)
|
FIRE-Final Inspection | 5/21/2008 | 5/21/2008 | 5/21/2008 | P | NR |
Forrest France
|
|
|
matt - fire life safety Phone #: ###-####
|
BLD-Framing/Rough-in | 4/14/2008 | 4/14/2008 | 4/14/2008 | P | PASS |
Dave Hannah
|
|
|
matt Phone #: ###-####
|
BLD-Framing/Rough-in | 2/21/2008 | 2/21/2008 | 2/21/2008 | P | PASS |
Dave Hannah
|
|
|
matt Phone #: ###-####
|