Permit Number | BLD07-03135 |
Status | Finaled |
Name |
CW HOME REPAIR
|
Site Address |
398 S 9TH ST Unit: 260
|
Project Name | BODO BLDG #4 |
Customer Number | |
ePlanReview | No |
Description |
(KOWALIS & MACKEY - BODO BLDG #4 - STE 260) PLAN MODIFICATION - 3/21/08 - TO COMBINE UNIT #260 AND UNIT #270 INTO ONE SUITE, UNIT 260. TO VOID PERMIT BLD07-03236 AND COMBINE ALL WORK AND OCCUPANCY APPROVAL UNDER THIS PERMIT. PLAN MODIFICATION WILL INCREASE THE AREA AND OCCUPANT LOAD FOR UNIT #260. A 5' + HALLWAY WILL CONNECT THE TWO OFFICE AREAS TO BE ONE. ALL RED-LINED COMMENTS AND ATTACHED PLAN REVIEW CONDITIONS ARE STILL APPLICABLE TO THIS PROJECT UNLESS SPECIFICALLY MODIFIED AS PART OF THE PLAN MODIFICATION APPLICATION & MODIFIED PLANS. drs This building is fully sprinklered for allowable area increase. To build out a new 6,706 sq. ft. office tenant space in new shell per approved plans. Work includes interior noncombustible framing with sheetrock cover to create private office's, open office area, work room, breakroom, reception/waiting and a conference rooms with folding partition to allow creation of two conference rooms; suspended ceiling grid system, millwork and finishes; upgrade electrical, mechanical, plumbing, sprinkler and alarm systems to meet tenant needs and comply with adopted codes and ordinances. Existing common restrooms, drinking fountain and service sink located on on second floor will satisfy requirements for this tenant space. drs
|