BLD-Aging Inspection | 1/23/2009 | 1/23/2009 | 1/23/2009 | | PASS |
Jim Storey
|
|
|
|
DOC - Permit Finaled | 1/23/2009 | 1/23/2009 | 1/23/2009 | P | PASS |
Jim Storey
|
|
|
|
BLD-Final | 8/6/2008 | 8/7/2008 | 8/7/2008 | A | PASS |
Jim Storey
|
|
|
dan Phone #: ###-####
|
Code Occupancy Approval | | | 8/6/2008 | | DONE |
|
|
|
Required parking lot striping completed 8/6/08- ok for ESC permit completion- Project Manager will bring in card for signature
|
BLD-Final | 7/30/2008 | 8/1/2008 | 8/1/2008 | A | PART |
Jim Storey
|
|
|
jim Phone #: ###-#### temp ok
|
FIRE-Final Inspection | 7/29/2008 | 7/30/2008 | 7/30/2008 | A | PASS |
Troy Cobbley
|
|
|
Life safety passed
|
FIRE-Final Inspection | 7/25/2008 | 7/25/2008 | 7/25/2008 | P | NR |
Forrest France
|
|
|
|
BLD-Energy code compliance | 7/16/2008 | 7/17/2008 | 7/17/2008 | A | PASS |
Jim Storey
|
|
|
Dan Phone #: ###-#### vapor barrior in place above ceilling and ok to place tile.
|
BLD-Other | 7/7/2008 | 7/8/2008 | 7/8/2008 | A | PART |
Jim Storey
|
|
|
Dan- ceiling Phone #: ###-#### pending vapor barrior instal to roof deck.
|
BLD-Energy code compliance | 5/12/2008 | 5/13/2008 | 5/13/2008 | A | PART |
Jim Storey
|
|
|
dan Phone #: ###-####
|
BLD-Energy code compliance | 5/12/2008 | 5/12/2008 | 5/12/2008 | P | NR |
Jim Storey
|
|
|
dan Phone #: ###-####
|
BLD-Energy code compliance | 5/9/2008 | 5/9/2008 | 5/9/2008 | P | FAIL |
Jim Storey
|
|
|
dan Phone #: ###-####
|
BLD-Framing/Rough-in | 5/9/2008 | 5/9/2008 | 5/9/2008 | P | PASS |
Jim Storey
|
|
|
dan Phone #: ###-#### c/n made ok
|
BLD-Energy code compliance | 5/8/2008 | 5/9/2008 | 5/9/2008 | A | FAIL |
Jim Storey
|
|
|
dan Phone #: ###-####
|
BLD-Conference | 4/8/2008 | 4/8/2008 | 4/8/2008 | P | PART |
Jim Storey
|
|
|
dan Phone #: ###-#### pending arch. drawnings.
|
BLD-Other | 4/2/2008 | 4/3/2008 | 4/3/2008 | P | PASS |
Jim Storey
|
|
|
dan Note: roof nailing Phone #: ###-####
|
BLD-Other | 2/21/2008 | 2/21/2008 | 2/21/2008 | P | PASS |
Jim Storey
|
|
|
dan Note: rebar stem wall Phone #: ###-#### si on site will review reports as received.
|
BLD-Footing | 2/15/2008 | 2/19/2008 | 2/19/2008 | A | PASS |
Jim Storey
|
|
|
dan Phone #: ###-#### si pending rfi to strucral engineer as to emt in footting.
|