BLD-Final | 8/13/2008 | 8/13/2008 | 8/13/2008 | P | PASS |
Jim Storey
|
|
|
|
DOC - Permit Finaled | 8/13/2008 | 8/13/2008 | 8/13/2008 | P | PASS |
Jim Storey
|
|
|
|
FIRE-Final Inspection | 8/12/2008 | 8/13/2008 | 8/13/2008 | P | CANC |
Dave Hannah
|
|
|
Scheduled by a contractor via Hello! on 8/12/2008 at 3:30:53 PM. Contact: ###-####.
|
BLD-Final | 5/20/2008 | 5/21/2008 | 5/21/2008 | A | NR |
Dave Hannah
|
|
|
sandmeyter construction Note: Please could you please meet with her 1st thing in morning before she goes to Mccall - please call ASAP Phone #: ###-#### needs other trades finaled
|
FIRE-Final Inspection | 5/19/2008 | 5/20/2008 | 5/20/2008 | A | CANC |
Forrest France
|
|
|
Scheduled by a contractor via Hello! on 5/19/2008 at 5:50:09 PM. Contact: ###-####. NOTE: Wrong inspection type called in........needed structural final. Permit details do not indicate any fire inspection signatures are required. Notified project contact to reschedule.
|
BLD-Energy code compliance | 2/25/2008 | 2/25/2008 | 2/25/2008 | P | PASS |
Dave Hannah
|
|
|
rhonda Phone #: ###-####
|
BLD-Framing/Rough-in | 2/7/2008 | 2/7/2008 | 2/7/2008 | P | PART |
Dave Hannah
|
|
|
rhonda Phone #: ###-#### ok to insulate addition area
|
BLD-Other | 12/31/2007 | 12/31/2007 | 12/31/2007 | P | PART |
Dave Hannah
|
|
|
rhonda Note: Please call 1/2 hr piior to inspection Phone #: ###-#### frost protection installed as per city aproved plans
|