BLD-Conference | 6/8/2016 | 6/10/2016 | 6/10/2016 | P | PEND |
Jim Sly
|
|
|
Bill ###-#### Call.....See if Electrical finaled 1st. No. Just waiting for electrical to final, so I can final structural. OK with all structural items.
|
BLD-Final | 6/7/2016 | 6/8/2016 | 6/8/2016 | A | NR |
Jim Sly
|
|
|
Bill-- Inspection okay per Bob Archibald-- please call before Phone #: ###-#### Need Electr. to final 1st.
|
BLD-Final | 1/21/2010 | 1/21/2010 | 1/21/2010 | P | DONE |
Jim Sly
|
|
|
EXP.
|
DOC - Permit Expired | 1/21/2010 | 1/21/2010 | 1/21/2010 | P | PASS |
Jim Sly
|
|
|
Called contr. left VM No return call...EXP.
|
BLD-Aging Inspection | 1/21/2010 | 1/21/2010 | 1/21/2010 | | CANC |
Jim Sly
|
|
|
Re-sched.....
|
BLD-Energy code compliance | 3/4/2008 | 3/4/2008 | 3/4/2008 | P | PASS |
Mike Jordan
|
|
|
david Phone #: ###-####
|
BLD-Framing/Rough-in | 2/28/2008 | 2/28/2008 | 2/28/2008 | P | PASS |
Dave Hannah
|
|
|
david Phone #: ###-#### ok to insulate
|
BLD-Concrete | 1/10/2008 | 1/11/2008 | 1/11/2008 | A | PASS |
Jim Sly
|
|
|
david Phone #: ###-#### Found wall ok
|
BLD-Concrete | 1/7/2008 | 1/7/2008 | 1/7/2008 | P | PASS |
Jim Sly
|
|
|
david Phone #: ###-#### Footing OK
|