BLD-Final | 3/17/2008 | 3/18/2008 | 3/18/2008 | A | PASS |
Jim Storey
|
|
|
Scheduled by a contractor via Hello! on 3/17/2008 at 6:10:51 PM. Contact: ###-####.
|
DOC - Permit Finaled | 3/18/2008 | 3/18/2008 | 3/18/2008 | P | PASS |
Jim Storey
|
|
|
|
BLD-Energy code compliance | 2/1/2008 | 2/4/2008 | 2/4/2008 | A | PART |
Jim Storey
|
|
|
Scheduled by a contractor via Hello! on 2/1/2008 at 3:43:09 PM. Contact: ###-####. sd to be instaled in common hall between bedrooms/ 2-2x8 fo gider info. to be provided at final.
|
BLD-Framing/Rough-in | 1/30/2008 | 1/31/2008 | 1/31/2008 | A | FAIL |
Jim Sly
|
|
|
michael Phone #: ###-#### C/N.....Lateral truss bracing....and BMC west to approve 2x8s in leiu of B-3 girders.OK to insul.
|
BLD-Foundation | 1/8/2008 | 1/9/2008 | 1/9/2008 | A | PART |
Mike Jordan
|
|
|
dan Note: please if possible around 11:00 am Phone #: ###-####. set backs ok. wip on remainin g forms.
|
BLD-Footing | 1/4/2008 | 1/7/2008 | 1/7/2008 | A | PART |
Jim Sly
|
|
|
don Phone #: ###-#### Couldn't make it before they poured......Talked to Builder ....and Concrete Contr. Setbacks, depth, dowels, and 1 #4 rebar in footing verified by them as OK....told them to pour and call wall insp..in......SNOWING! Bad Roads.
|