Information based on query as of Tuesday, July 16, 2024.
Permit Information
Permit NumberBLD07-03256
StatusFinaled
Name NORTH STAR HOMES, LLC
Site Address 1343 S DIVISION AVE
Project Name 
Customer NumberSEE COMMENTS
ePlanReviewNo
Description
This permit is for a two story single family dwelling with a detached garage. The garage is built on a zero lot line and has used UL Des U301 to construct a two hour wall. The house has 952 Sq. Ft. on the first story and 850 Sq. Ft. on the second story. There is also covered porches on both ends of the house with a smaller covered section on the second story of the front that combined equal 214 Sq. Ft. of covered area. The garage is 441 Sq. Ft. The side with a three foot setback will have fire protected eaves per all red lining and plan review report. R-2 zoning district, building setbacks and DRH07-495 per Planning and Zoning. (BSP)
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Final8/22/20088/25/20088/26/2008APASS
DetailsJim Storey
Keys are in Exterior Electrical Box on Front. Call me, Kyle, 30 minutes prior and I will meet you. This is the final reinspect. The earlier in the morning the better. Thank you. Phone #: ###-#### Internet Inspection Request from: Kyle Schnoor
DOC - Permit Finaled8/26/20088/26/20088/26/2008PPASS
DetailsJim Storey
Code Occupancy Approval  8/26/2008 DONE
BLD-Final8/15/20088/15/20088/15/2008PNR
DetailsJim Storey
If possible please call me 30 minutes prior to inspection so I can meet you on the job in order to better understand and correct any issues. Thank you. Phone #: ###-#### Internet Inspection Request from: Kyle Schnoor
BLD-Energy code compliance4/22/20084/23/20084/23/2008APASS
DetailsJim Storey
If locked the key is in the house next to it tucked into the hurricane strap at the bottom left of the entry door. Phone #: ###-#### Internet Inspection Request from: Kyle Schnoor
BLD-Framing/Rough-in4/17/20084/18/20084/18/2008PPASS
DetailsDave Hannah
Scheduled by a contractor via Hello! on 4/17/2008 at 4:56:17 PM. Contact: ###-####.
BLD-Conference4/1/20084/1/20084/1/2008PPASS
DetailsJim Storey
BLD-Footing3/11/20083/11/20083/11/2008PPASS
DetailsTom Arcoraci
clay Phone #: ###-####
BLD-Foundation3/6/20083/6/20083/6/2008APASS
DetailsJim Sly
Scheduled by a contractor via Hello! on 3/6/2008 at 7:29:29 AM. Contact: ###-####.
BLD-Footing3/3/20083/3/20083/3/2008PPASS
DetailsJim Storey
bob Phone #: ###-####