Information based on query as of Sunday, June 30, 2024.
Permit Information
Permit NumberBLD08-00134
StatusFinaled
Name STEALTH DEVELOPMENT
Site Address 4904 W DOUGLAS LN
Project Nameduplex - 4904 & 4906 douglas
Customer Number 
ePlanReviewNo
Description
This permit is for the construction of a new 2040 Sq. Ft. duplex with a slab on grade foundation. The floor plans are identically reflected with an offset of four feet. The first story of each is 533 Sq. Ft. with a kitchen, dining room, one bathroom, fireplace, and attached garages of 229 Sq. Ft. The second level of each is 487 Sq. Ft. with two bedrooms and one bathroom. The eaves that project into the five foot setback will be protected to a one hour rating per detail. The dwelling unit separation wall will be built to gypsum detail WP 3370. THIS STRUCTURE IS BEING BUILT TO ONLY MEET DUPLEX STANDARDS AND NOT TO BE SOLD AS INDIVIDUAL UNITS. Built per approved plans, all engineering, and plan review report. R-2 zoning district, building setbacks, and CAA08-00028 per Planning and Zoning. (BSP)
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Final8/11/20088/11/20088/11/2008PPASS
DetailsMike Jordan
DOC - Permit Finaled8/11/20088/11/20088/11/2008PPASS
DetailsMike Jordan
BLD-Final8/11/20088/11/20088/11/2008ACANC
DetailsMike Jordan
Scheduled by a contractor via Hello! on 8/11/2008 at 7:17:48 AM. Contact: ###-####.
BLD-Final8/5/20088/6/20088/6/2008ANR
DetailsTony Young
Scheduled by a contractor via Hello! on 8/5/2008 at 11:52:17 AM. Contact: ###-####.
need mech
Code Occupancy Approval8/5/20088/5/20088/5/2008PPASS
DetailsDena Gambrel
8-5-08 1130 Passed.
Code Occupancy Approval8/4/20088/4/20088/4/2008PFAIL
DetailsDena Gambrel
8-4-08 Failed. Need more plants in the front bedding area.
BLD-Energy code compliance7/7/20087/7/20087/7/2008PPASS
DetailsJim Storey
Scheduled by a contractor via Hello! on 7/7/2008 at 10:35:31 AM. Contact: ###-####.stickers ok on window e record not clear.
BLD-Energy code compliance7/3/20087/3/20087/3/2008PNR
DetailsDave Hannah
Scheduled by a contractor via Hello! on 7/3/2008 at 7:42:04 AM. Contact: ###-####.
BLD-Framing/Rough-in7/2/20087/2/20087/2/2008PNR
DetailsTom Arcoraci
Scheduled by a contractor via Hello! on 7/2/2008 at 10:51:40 AM. Contact: ###-####. needs elec and air sealing
BLD-Foundation5/1/20085/5/20085/5/2008APASS
DetailsTom Arcoraci
jerry - pouring at 10:00 Phone #: ###-####
BLD-Footing5/1/20085/2/20085/2/2008APASS
DetailsTom Arcoraci
jerry - pouring at 10:00 Phone #: ###-####