BLD-Final | 10/28/2008 | 10/29/2008 | 10/29/2008 | P | PASS |
Tony Young
|
|
|
Scheduled by a contractor via Hello! on 10/28/2008 at 1:08:05 PM. Contact: ###-####. ok for perm occ.
|
FIRE-Final Inspection | 10/28/2008 | 10/29/2008 | 10/29/2008 | P | PASS |
Troy Cobbley
|
|
|
life safety passed
|
FIRE-Final Inspection | 10/28/2008 | 10/29/2008 | 10/29/2008 | A | PASS |
Troy Cobbley
|
|
|
life safety passed
|
BLD-Final | 9/2/2008 | 9/4/2008 | 9/4/2008 | A | PART |
Tony Young
|
|
|
Scheduled by a contractor via Hello! on 9/2/2008 at 2:23:22 PM. Contact: ###-####. ok for temp occ. pend others,, then ok for perm occ.
|
FIRE-Final Inspection | 8/28/2008 | 9/2/2008 | 9/3/2008 | P | PART |
Troy Cobbley
|
|
|
A temporary occupancy was given for the life safety portion of this inspection, with sam rogers permission, until the dedicated fire line issue is resolved. The United Water inspector has raised this issue.
|
BLD-Final | 8/28/2008 | 9/3/2008 | 9/2/2008 | A | CANC |
Tony Young
|
|
|
Danton ###-#### Disp set to [CANC] by a contractor via Hello! on Sep 2 2008 2:24PM.
|
BLD-Other | 8/26/2008 | 8/27/2008 | 8/27/2008 | P | PART |
Tony Young
|
|
|
Scheduled by a contractor via Hello! on 8/26/2008 at 8:03:46 AM. Contact: ###-####.,, ceiling grid ok pending trades
|
BLD-Framing/Rough-in | 8/26/2008 | 8/26/2008 | 8/26/2008 | P | NR |
Tony Young
|
|
|
Scheduled by a contractor via Hello! on 8/26/2008 at 8:03:46 AM. Contact: ###-####. need trades 1st for ceiling grid
|
BLD-Framing/Rough-in | 5/22/2008 | 5/23/2008 | 5/23/2008 | A | PASS |
Mike Jordan
|
|
|
Scheduled by a contractor via Hello! on 5/22/2008 at 12:10:21 PM. Contact: ###-####.
|