Information based on query as of Saturday, June 29, 2024.
Permit Information
Permit NumberBLD08-00254
StatusFinaled
Name VERTICAL CONSTRUCTION
Site Address 213 N 9TH ST
Project NameSEDGWICK CENTER-1ST FLR
Customer Number 
ePlanReviewNo
Description
(D. L. EVANS BRANCH BANK - SEDGWICK CENTER - 1ST STORY) (CZC08-00010) This building is fire sprinklered to comply with high-rise provisions. To construct a bank within an existing 4,590 square foot tenant space located on the 1st story of a high-rise building. Work is to include interior nonbearing walls, interior doors, interior windows, a night deposit box, an ATM, suspended gypsum board ceiling, suspended acoustical ceilings, gypsum board soffits, millwork, an exterior window, an exterior metal window panel, and finishes. The work is required to comply with the approved drawings, with the plan review report, and with all applicable codes and ordinances. The fire sprinkler system is required to comply with NFPA 13 as regulated by the Fire Department. **CJW**
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
FIRE-Final Inspection6/18/20086/18/20086/18/2008PPASS
DetailsForrest France
Fire life safety passed final inspection.
BLD-Final6/17/20086/17/20086/17/2008PPART
DetailsDave Hannah
Scheduled by a contractor via Hello! on 6/17/2008 at 8:21:13 AM. Contact: ###-####.ok for temp occ ok for perm occ after fire gos perm
FIRE-Final Inspection6/17/20086/17/20086/17/2008PPART
DetailsForrest France
Final pending project related fire alarm permit final, okayed for temporary occupancy.
FIRE-Final Inspection6/16/20086/17/20086/17/2008APART
DetailsForrest France
Fire life safety inspection completed okay, final pending project related fire alarm work corrections.
BLD-Final6/16/20086/16/20086/17/2008PCANC
DetailsDave Hannah
Scheduled by a contractor via Hello! on 6/16/2008 at 7:29:15 AM. Contact: ###-####.
BLD-Final6/16/20086/16/20086/16/2008ACANC
DetailsDave Hannah
Scheduled by a contractor via Hello! on 6/16/2008 at 7:29:15 AM. Contact: ###-####.
BLD-Other5/23/20085/27/20085/27/2008APASS
DetailsJim Sly
Scheduled by a contractor via Hello! on 5/23/2008 at 12:12:53 PM. Contact: ###-####.
Ceiling grid OK.
BLD-Framing/Rough-in4/10/20084/11/20084/11/2008APART
DetailsDave Hannah
todd Phone #: ###-#### ok to cover walls on the west half
BLD-Framing/Rough-in4/7/20084/7/20084/7/2008PPART
DetailsDave Hannah
Tod, this is for a partial framing; Phone #: ###-#### Internet Inspection Request from: Cathy Weisshaupt walls on east half ok to cover