BLD-Final | 4/28/2008 | 4/29/2008 | 4/29/2008 | A | PASS |
Tony Young
|
|
|
rob Phone #: ###-#### scope of this permit is done,, reviewed doc from struct engineer of ok as built,, contractor copy,, stamped
|
DOC - Permit Finaled | 4/29/2008 | 4/29/2008 | 4/29/2008 | P | PASS |
Tony Young
|
|
|
|
BLD-Final | 4/24/2008 | 4/25/2008 | 4/25/2008 | A | PART |
Tony Young
|
|
|
Scheduled by a contractor via Hello! on 4/24/2008 at 5:45:06 PM. partial,, I. T, area ok to occupy,, still working on classroom,, will need final letter of approval from structural engineer on special inspections and RFIs, temp occ ok
|
FIRE-Final Inspection | 4/24/2008 | 4/25/2008 | 4/25/2008 | A | PASS |
Forrest France
|
|
|
Items on correction notice verified for compliance, fire life safety passed.
|
BLD-Final | 4/23/2008 | 4/24/2008 | 4/24/2008 | P | CANC |
Jim Storey
|
|
|
rob Phone #: ###-####
|
FIRE-Final Inspection | 4/23/2008 | 4/24/2008 | 4/24/2008 | A | FAIL |
Forrest France
|
|
|
Provide approved door hardware at two locations, lower the fire extinguisher to no higher than 48" AFF, relocate one exit sign per plan, repair one exit sign and EM light at the future cad classroom, path of egrees must remain clear, need to install field ceiling tile at sprinkler pendents.
|
FIRE-Conference | 4/23/2008 | 4/23/2008 | 4/23/2008 | P | DONE |
Forrest France
|
|
|
Regarding project related fire sprinkler work.
|
FIRE-Final Inspection | 4/18/2008 | 4/22/2008 | 4/22/2008 | P | FAIL |
Forrest France
|
|
|
Need to final project related fire sprinkler permit prior to life safety approval.
|
FIRE-Alarm Testing | 4/18/2008 | 4/22/2008 | 4/22/2008 | P | DONE |
Forrest France
|
|
|
Duplicate inspection request.
|
BLD-Framing/Rough-in | 4/16/2008 | 4/17/2008 | 4/17/2008 | A | PART |
Tony Young
|
|
|
Rob; Phone #: ###-#### Internet Inspection Request from: Cathy Weisshaupt ok to cover ceiling with no sprinkler work
|
BLD-Framing/Rough-in | 4/15/2008 | 4/16/2008 | 4/16/2008 | A | NR |
Tony Young
|
|
|
rob Phone #: ###-#### on site conf,, need trades 1st
|
BLD-Framing/Rough-in | 4/10/2008 | 4/10/2008 | 4/10/2008 | P | PART |
Tony Young
|
|
|
rob Phone #: ###-#### south area seismic ok,, wall ok to cover,, open area of ceiling ok as fixed,, will get RFIs at end of job w/ letter of ok from architect
|
BLD-Framing/Rough-in | 4/7/2008 | 4/7/2008 | 4/7/2008 | P | PART |
Tony Young
|
|
|
Rob Phone #: ###-#### same as am
|
BLD-Wall cover | 4/7/2008 | 4/7/2008 | 4/7/2008 | A | PART |
Tony Young
|
|
|
Rob Phone #: ###-#### south end of east wall ok
|
BLD-Framing/Rough-in | 4/3/2008 | 4/4/2008 | 4/4/2008 | A | PART |
Tony Young
|
|
|
rob Phone #: ###-#### part,, seismic ties on north basement wall and part of east wall as noted on plans
|
BLD-Framing/Rough-in | 4/2/2008 | 4/3/2008 | 4/3/2008 | A | CANC |
Tony Young
|
|
|
ROB Phone #: ###-####
|
BLD-Framing/Rough-in | 4/1/2008 | 4/2/2008 | 4/2/2008 | A | PART |
Dave Hannah
|
|
|
rob note: cover Phone #: ###-#### seicmic strapes along east wall in floor ok to cover
|
BLD-Conference | 3/31/2008 | 4/1/2008 | 4/1/2008 | A | PART |
Tony Young
|
|
|
Scheduled by a contractor via Hello! on 3/31/2008 at 3:46:08 PM. Contact: ###-####. need a designed fix from the architect for unforseen opening along ceiling
|
FIRE-Conference | 3/24/2008 | 3/25/2008 | 3/25/2008 | A | DONE |
Forrest France
|
|
|
On site conference regarding necessary modifications to the existing fire sprinkler system due to building remodel work.
|