BLD-Final | 8/19/2008 | 8/20/2008 | 8/20/2008 | A | PASS |
Dave Hannah
|
|
|
richard Phone #: ###-#### - please call1/2 hr prior to inspection
|
DOC - Permit Finaled | 8/20/2008 | 8/20/2008 | 8/20/2008 | P | PASS |
Dave Hannah
|
|
|
|
FIRE-Final Inspection | 8/18/2008 | 8/19/2008 | 8/19/2008 | A | PASS |
Troy Cobbley
|
|
|
Life safety passed. Sprinkler modifications not required per letter from American Fire Protection
|
BLD-Final | 5/20/2008 | 5/21/2008 | 5/21/2008 | A | CANC |
Dave Hannah
|
|
|
richard Phone #: ###-####
|
FIRE-Final Inspection | 5/20/2008 | 5/20/2008 | 5/20/2008 | P | FAIL |
Troy Cobbley
|
|
|
One upright sprinkler is too close to the wall. Another two are two close together and sprinkler spacing needs to be verified by a qualified sprinkler contractor for coverage on either side of the new wall. A permit will be required for this work. All other life safety items are ok.
|
BLD-Framing/Rough-in | 3/25/2008 | 3/26/2008 | 3/26/2008 | A | PASS |
Dave Hannah
|
|
|
rich Note: please call 1/2 hr prior to inspection Phone #: ###-####
|