BLD-Final | 12/4/2008 | 12/4/2008 | 12/4/2008 | P | PASS |
Dave Hannah
|
|
|
gary Phone #: ###-#### ok for perm occ
|
BLD-Final | 4/16/2008 | 4/17/2008 | 4/17/2008 | A | PART |
Dave Hannah
|
|
|
Gary; Phone #: ###-#### Internet Inspection Request from: Cathy Weisshaupt ok for temp occ ok for perm after new store fronts installed
|
FIRE-Final Inspection | 4/8/2008 | 4/9/2008 | 4/9/2008 | P | PASS |
Forrest France
|
|
|
Fire life safety inspection is satisfactory pending main entry door hardware is changed to approved type, NOTE: to be verified at the structural final per agreement.
|