BLD-Final | 8/19/2008 | 8/20/2008 | 8/20/2008 | P | PASS |
Jim Sly
|
|
|
Scheduled by a contractor via Hello! on 8/19/2008 at 4:20:58 PM. Contact: ###-####. C/C issued
|
DOC - Permit Finaled | 8/20/2008 | 8/20/2008 | 8/20/2008 | P | PASS |
Jim Sly
|
|
|
|
BLD-Framing/Rough-in | 7/9/2008 | 7/9/2008 | 7/9/2008 | P | PASS |
Jim Sly
|
|
|
Scheduled by a contractor via Hello! on 7/9/2008 at 8:36:42 AM. Contact: ###-####.
|
BLD-Framing/Rough-in | 6/23/2008 | 6/23/2008 | 6/23/2008 | P | PART |
Jim Sly
|
|
|
Scheduled by a contractor via Hello! on 6/23/2008 at 7:50:30 AM. Contact: ###-####. Checked framing,...then noticed that Plumb and Electr R/I not done........OK pending approvals (Frame...OK).
|
BLD-Footing | 3/28/2008 | 3/31/2008 | 3/31/2008 | A | PASS |
Jim Sly
|
|
|
Jeff, 1st thing if possible in the a.m.; Phone #: ###-#### Internet Inspection Request from: Cathy Weisshaupt
|