BLD-Final | 8/11/2010 | 8/12/2010 | 8/12/2010 | A | PASS |
Jim Sly
|
|
|
call Elyse for access info ###-####
|
DOC - Permit Finaled | 8/12/2010 | 8/12/2010 | 8/12/2010 | P | PASS |
Jim Sly
|
|
|
|
BLD-Final | 2/23/2010 | 2/24/2010 | 2/24/2010 | A | DONE |
Jim Sly
|
|
|
PJ phone.........Expired
|
DOC - Permit Expired | 2/24/2010 | 2/24/2010 | 2/24/2010 | P | PASS |
Jim Sly
|
|
|
PJ phone.
|
BLD-Final | 2/23/2010 | 2/23/2010 | 2/23/2010 | P | CANC |
Jim Sly
|
|
|
Left VM.................waiting for return call. Re-sched for AM
|
FIRE-Hydro test above ground | 2/22/2010 | 2/23/2010 | 2/23/2010 | P | CANC |
Jim Sly
|
|
|
|
BLD-Conference | 2/19/2010 | 2/22/2010 | 2/22/2010 | A | CANC |
Jim Sly
|
|
|
PJ
|
BLD-Conference | 2/19/2010 | 2/19/2010 | 2/19/2010 | P | CANC |
Jim Sly
|
|
|
PJ phone
|
BLD-Conference | 2/18/2010 | 2/19/2010 | 2/19/2010 | A | CANC |
Jim Sly
|
|
|
Re-sched for PM
|
BLD-Final | 2/18/2010 | 2/18/2010 | 2/18/2010 | P | CANC |
Jim Sly
|
|
|
P J phone Called left VM
|
BLD-Aging Inspection | 2/18/2010 | 2/18/2010 | 2/18/2010 | | CANC |
Jim Sly
|
|
|
Re-sched....
|
BLD-Energy code compliance | 7/24/2008 | 7/25/2008 | 7/28/2008 | A | PASS |
Jim Sly
|
|
|
Rob Phone #: ###-####
|
BLD-Framing/Rough-in | 7/21/2008 | 7/22/2008 | 7/22/2008 | A | PASS |
Jim Sly
|
|
|
Rob Phone #: ###-####
|
BLD-Foundation | 5/30/2008 | 6/2/2008 | 6/2/2008 | A | PASS |
Jim Sly
|
|
|
cliff Phone #: ###-####
|
BLD-Footing | 5/29/2008 | 5/29/2008 | 5/29/2008 | P | PART |
Mike Jordan
|
|
|
Cliff = ); Phone #: ###-#### Internet Inspection Request from: Cathy Weisshaupt. wip. lot lines strung, forms being installed.
|