BLD-Final | 5/6/2008 | 5/7/2008 | 5/7/2008 | P | PASS |
Jim Storey
|
|
|
Scheduled by a contractor via Hello! on 5/6/2008 at 12:20:54 PM. Contact: ###-####. card signed on site.
|
FIRE-Final Inspection | 5/6/2008 | 5/7/2008 | 5/7/2008 | A | PASS |
Forrest France
|
|
|
Items on correction notice are finished, life safety passed.
|
BLD-Final | 4/24/2008 | 4/25/2008 | 4/25/2008 | P | FAIL |
Jim Storey
|
|
|
Scheduled by a contractor via Hello! on 4/24/2008 at 5:29:07 PM. Contact: ###-####. main entry keyed deadbolt w/sign/ lever on restaroom/ bag trap/ fir final
|
FIRE-Final Inspection | 4/24/2008 | 4/25/2008 | 4/25/2008 | A | FAIL |
Forrest France
|
|
|
Remove the manual thumbturn at the main entry/exit door and provide signage above the door "door to remain unlocked while building is occupied", repair the non-functional EM light at the hallway, post suite address, provide approved hardware at the restroom door.
|