Information based on query as of Tuesday, July 16, 2024.
Permit Information
Permit NumberBLD08-00662
StatusExpired
Name MORRIS CONSTRUCTION
Site Address 34 S MESA VISTA DR
Project Name 
Customer Number 
ePlanReviewNo
Description
This permit is for the construction of a 30x24 two car garage with a bonus room above of 336 sq. ft. Separate electrical, mechanical, and plumbing permits are required. THE PERMIT HOLDER is responsible to comply with current wall bracing R602.10 or build to an engineered design. The floor under the bonus room is also insulated. Deck construction is to be 2x6 joists on 4x4 posts spaced 10 feet on center. Beams will be 4x8 or better. Built per all approved plans, red lining and plan review report. R-1C zoning district, building setbacks, CAA08-00049, and CZC08-00037 per planning and zoning. (BSP)
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
DOC - Permit Expired7/21/20107/22/20107/22/2010APASS
DetailsJim Storey
R105.5 Expiration.
Every permit issued shall become invalid unless the work authorized by such permit is commenced within 180 days after its issuance, or if the work authorized by such permit is suspended or abandoned for a period of 180 days after the time the work is commenced. The building official is authorized to grant, in writing, one or more extensions of time, for periods not more than 180 days each. The extension shall be requested in writing and justifiable cause demonstrated.

R105.8 Responsibility.
It shall be the duty of every person who performs work for the installation or repair of building, structure, electrical, gas, mechanical or plumbing systems, for which this code is applicable, to comply with this code.

BLD-Aging Inspection7/14/20107/14/20107/22/2010 PASS
DetailsJim Storey
R105.5 Expiration.
Every permit issued shall become invalid unless the work authorized by such permit is commenced within 180 days after its issuance, or if the work authorized by such permit is suspended or abandoned for a period of 180 days after the time the work is commenced. The building official is authorized to grant, in writing, one or more extensions of time, for periods not more than 180 days each. The extension shall be requested in writing and justifiable cause demonstrated.

R105.8 Responsibility.
It shall be the duty of every person who performs work for the installation or repair of building, structure, electrical, gas, mechanical or plumbing systems, for which this code is applicable, to comply with this code.

BLD-Aging Inspection5/10/20105/10/20105/10/2010 PASS
DetailsJim Storey
BLD-Aging Inspection3/8/20103/8/20103/8/2010 PASS
DetailsJim Storey
home owner work in progress slow.
BLD-Aging Inspection1/4/20101/4/20101/12/2010 PEND
DetailsJim Storey
ele/mec/plm
BLD-Energy code compliance4/1/20094/1/20094/1/2009APASS
DetailsJim Storey
BLD-Framing/Rough-in3/27/20093/30/20093/30/2009APASS
DetailsJim Storey
steve Phone #: ###-####
BLD-Conference6/23/20086/23/20086/23/2008PPASS
DetailsJim Storey
anonymous phone call that project is not being built to plans. The garage/bonus room is being attached to existing building when plans show it detached. n/a
BLD-Foundation4/30/20085/1/20085/1/2008ADONE
DetailsTony Young
steve Phone #: ###-####
poured
BLD-Footing4/29/20084/30/20084/30/2008APASS
DetailsJim Storey
Steve Phone #: ###-####