Permit Information
Permit NumberBLD08-00664
StatusFinaled
Name PETRA INC
Site Address 1116 N COLE RD
Project NameBOISE RAQUET AND SWIM CLUB
Customer Number 
ePlanReviewNo
Description
Boise Racquet and Swim Club - (Indoor Tennis Building) - To construct a new 31,375 square foot, one story covered tennis court building with a 3,025 square foot mezzanine for viewing matches. The building is constructed of a pre-engineered metal building with a wood framed mezzanine. This building is fully fire sprinkled. The sprinklers are used for area increase. This permit also includes related site improvements. All construction per the approved plans and attached comment list. JCM NEED EROSION RP PRIOR TO ISSUANCE OF PERMIT.
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Final10/14/200810/15/200810/15/2008APART
DetailsJim Sly
Gene Phone #: ###-####
OK for Temp Occ. OK for Perm Occ. when Plumb perms.
BLD-Final10/13/200810/14/200810/15/2008PNR
DetailsDave Hannah
GENE Phone #: ###-#### needs fire finals
FIRE-Final Inspection10/14/200810/15/200810/15/2008APASS
DetailsTroy Cobbley
Permit finaled per notes of last inspection. KR
FIRE-Final Inspection10/13/200810/14/200810/14/2008AFAIL
DetailsTroy Cobbley
Life safety will pass when the related fire sprinkler permit is finaled. I had Gene delete the two fire extinguishers located behind the curtain and provide a fire extinguisher at the north exit door. I also had Gene remove the curtain that was blocking the north exit door as per the approved plans.
FIRE-Final Inspection10/10/200810/13/200810/13/2008AFAIL
DetailsTroy Cobbley
The project related fire sprinkler permits were not completed. I also pointed out the requirement for the addition of the horn/strobe and the inadequate fire dept access. No inspection was actually performed.
BLD-Framing/Rough-in9/5/20089/8/20089/8/2008APASS
DetailsMike Jordan
jean Phone #: ###-####. All framing issues resolved. Verified ada backing. Also noted that flame spread and smoke dev. index ok per specs provided for fabric facing and insul.
BLD-Framing/Rough-in9/3/20089/3/20089/3/2008APART
DetailsMike Jordan
gene Phone #: ###-####. Framing for restrooms and mezz. Need to verify ada backing and needs to move stairs over to avoid column at middle landing for proper exiting width.
BLD-Energy code compliance8/14/20088/15/20088/15/2008APART
DetailsMike Jordan
Gene Phone #: ###-####. South wall, and portion of west wall. Needs to supply smoke and flame spread values for facing on next insp.
BLD-Footing6/20/20086/23/20086/23/2008APASS
DetailsTom Arcoraci
gene Phone #: ###-#### spec insp on site
BLD-Footing6/17/20086/18/20086/18/2008APART
DetailsJim Storey
Gene, late a.m. if possible; Phone #: ###-#### Internet Inspection Request from: Cathy Weisshaupt ft north side and east end ok south wall ok si to be on site.
BLD-Footing6/12/20086/12/20086/12/2008PPASS
DetailsTom Arcoraci
Jean Phone #: ###-####