Permit Information
Permit NumberBLD08-00703
StatusFinaled
Name HC COMPANY INC
Site Address 720 E PARK BLVD
Project NameMK PLAZA - 4TH FLR
Customer Number 
ePlanReviewNo
Description
(4th FLOOR 1-HOUR CORRIDOR SYSTEM UPGRADE) A safe exiting system shall be maintained during the construction phase. Exit paths to be kept clear of debris and not used to store staging materials. This building is not sprinklered per 1973 UBC when constructed. Work includes select demolition; construction of 1-hour fire partition walls to create 1-hour corridor and separate elevator lobby from corridor; install listed & labeled, 20 minute fire rated, "S" labeled smoke-draft control, self closing with listed hardware door/frame assemblies at all openings into corridor except doors to existing stair enclosures; modify ceiling grid, mechanical, electrical, plumbing, alarm, exit signage / emergency illumination and finishes. This rated exit corridor is being installed per Sec.1015.2, exception #1 for exit separation between existing stair enclosures and to delete existing 2-hour horizontal exit installed under previous permit to provide separation. All per approved plans, notes on plans and attached plan review conditions of all plan reviewing agencies. drs
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Final3/25/20093/26/20093/26/2009APASS
DetailsDave Hannah
Jason Crites ###-####///please call 30 prior to meet
DOC - Permit Finaled3/26/20093/26/20093/26/2009PPASS
DetailsDave Hannah
FIRE-Final Inspection3/24/20093/25/20093/25/2009APASS
DetailsForrest France
Correction notice items field verified for compliance, fire life safety finaled.
BLD-Final3/13/20093/16/20093/16/2009PFAIL
DetailsDave Hannah
Jason- call 30 mins prior to going Phone #: ###-#### needs fire finals first
FIRE-Final Inspection3/13/20093/16/20093/16/2009AFAIL
DetailsForrest France
Need to adjust closure at the east side pair of elevator lobby doors, provide approved hardware at both stairway exit doors. EM lighting and exit signs tested okay.
FIRE-Final Inspection3/13/20093/13/20093/13/2009PPART
DetailsForrest France
Project related fire alarm permit work finaled.
BLD-Final3/11/20093/11/20093/11/2009PNR
DetailsDave Hannah
jason - please call 1/2 prior so he can let you in Phone #: ###-#### needs fire and elec finals first
BLD-Wall cover9/30/200810/1/200810/1/2008APART
DetailsDave Hannah
Phone #: ###-#### Internet Inspection Request from: Steve Jones ok to cover ceiling
BLD-Wall cover9/16/20089/16/20089/16/2008AFAIL
DetailsDave Hannah
Scheduled by a contractor via Hello! on 9/16/2008 at 7:28:20 AM. Contact: ###-####.one hour corrador finish ceiling grid fire caulking and access doors to fire dampeers out of shafts
BLD-Framing/Rough-in7/25/20087/28/20087/28/2008PPART
DetailsJim Storey
Scheduled by a contractor via Hello! on 7/25/2008 at 3:15:59 PM. Contact: ###-####. floor fire stop ok reviewed fire brick submital and aproved for concrete wall aplaction.
BLD-Framing/Rough-in7/3/20087/3/20087/3/2008PPART
DetailsDave Hannah
Scheduled by a contractor via Hello! on 7/3/2008 at 7:48:21 AM. Contact: ###-####. ok to cover walls
BLD-Conference6/19/20086/20/20086/20/2008PDONE
DetailsDave Hannah
Scheduled by a contractor via Hello! on 6/19/2008 at 4:37:07 PM. Contact: ###-####.