BLD-Final | 4/9/2009 | 4/10/2009 | 4/10/2009 | A | PASS |
Dave Hannah
|
|
|
Gary Phone #: ###-####
|
DOC - Permit Finaled | 4/10/2009 | 4/10/2009 | 4/10/2009 | P | PASS |
Dave Hannah
|
|
|
|
BLD-Final | 2/25/2009 | 2/26/2009 | 2/26/2009 | A | PART |
Dave Hannah
|
|
|
Gary Phone #: ###-#### every thing ok but needs bat pwr smoke detector
|
BLD-Energy code compliance | 7/11/2008 | 7/11/2008 | 7/11/2008 | P | PASS |
Jim Storey
|
|
|
Gary Phone #: ###-#### engineering verified beams ok.
|
BLD-Framing/Rough-in | 7/8/2008 | 7/9/2008 | 7/9/2008 | A | PART |
Dave Hannah
|
|
|
gary Phone #: ###-#### ok to insulate but need an engineer to look at beam ends they have been notched and cut at an angel
|
BLD-Foundation | 4/30/2008 | 5/1/2008 | 5/1/2008 | P | PART |
Mike Jordan
|
|
|
Gary, early afternoon if possible; Phone #: ###-#### Internet Inspection Request from: Cathy Weisshaupt
|
BLD-Footing | 4/29/2008 | 4/30/2008 | 4/30/2008 | A | PASS |
Dave Hannah
|
|
|
gary Note: concrete pouring 9:00 am Phone #: ###-####
|