BLD-Conference | 10/3/2008 | 10/3/2008 | 10/3/2008 | P | DONE |
Mike Jordan
|
|
|
Contractor to submit drawing to design review for new roof line.
|
BLD-Final | 10/3/2008 | 10/3/2008 | 10/3/2008 | P | NR |
Mike Jordan
|
|
|
Scheduled by a contractor via Hello! on 10/3/2008 at 10:46:07 AM. Contact: ###-####.
|
BLD-Conference | 10/2/2008 | 10/3/2008 | 10/3/2008 | A | CANC |
Jim Sly
|
|
|
|
BLD-Final | 10/3/2008 | 10/3/2008 | 10/3/2008 | P | PASS |
George Slane
|
|
|
Per George Slane pass final inspection and issue residential certificate of occupancy
|
BLD-Framing/Rough-in | 10/3/2008 | 10/3/2008 | 10/3/2008 | P | PASS |
George Slane
|
|
|
per George Slane pass framing inspection
|
Code Occupancy Approval | | | 10/3/2008 | | PASS |
|
|
|
|
DOC - Permit Finaled | | | 10/3/2008 | | DONE |
Tisha Gallop
|
|
|
|
BLD-Conference | 10/2/2008 | 10/2/2008 | 10/2/2008 | P | CANC |
Jim Sly
|
|
|
Re-scheduled for 10/3
|
BLD-Final | 10/2/2008 | 10/2/2008 | 10/2/2008 | P | NR |
Mike Jordan
|
|
|
Scheduled by a contractor via Hello! on 10/2/2008 at 11:02:22 AM. Contact: ###-####. Needs elec. and zoning.
|
Code Occupancy Approval Temp | | | 10/2/2008 | | DONE |
|
|
|
Staff has granted the applicant temporary occupancy for 30 days. This will provdie the applicant with the time necessary to submit revised elevations for the DR file and the buildign permit. Once these items have been submitted, staff will be able to sign off completely. ANT 10-2-08
|
BLD-Framing/Rough-in | 8/28/2008 | 8/28/2008 | 8/28/2008 | P | CANC |
Jim Sly
|
|
|
Scheduled by a contractor via Hello! on 8/28/2008 at 10:56:48 AM. Contact: ###-####.
|
BLD-Foundation | 5/28/2008 | 5/28/2008 | 5/28/2008 | P | PASS |
Tom Arcoraci
|
|
|
Scheduled by a contractor via Hello! on 5/28/2008 at 9:27:51 AM. Contact: ###-####.
|
BLD-Foundation | 5/21/2008 | 5/22/2008 | 5/22/2008 | A | PASS |
Tom Arcoraci
|
|
|
Scheduled by a contractor via Hello! on 5/21/2008 at 12:15:10 PM. Contact: ###-####.
|