Information based on query as of Tuesday, July 16, 2024.
Permit Information
Permit NumberBLD08-00795
StatusFinaled
Name BOB CAFFERTY BUILDERS INC
Site Address 250 E PARKCENTER BLVD
Project NameSUPER VALU Phase 5B
Customer Number 
ePlanReviewNo
Description
*(SUPERVALUE)* - *(PHASE 5B)*-(1st Floor) To remodel a 10,009 sq.ft. area within existing 257,200 sq.ft. 1st story, located in the interior southwest quadrant of the building. New office space construction and remodel per tenant improvement plans. Work to include, selective demolition of interior nonbearing partitions, construction of new partitions for private office spaces, small conference rooms, and open office area, repair and relocate existing suspended ceiling and lighting, relocate any diffusers as necessary, this building is fully fire sprinklered for unlimited area any alterations to the sprinkler system shall be per NFPA #13 as regulated by the fire department. FPP Project contact the team asigned to this building via cell phones to requist all insp. The fir07-01005 permit to have all sprinkler heads thurout the building is the control permit to remove all rated corridors under the 2003/2006 IBC. 301
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
DOC - Permit Finaled6/27/20086/27/20086/27/2008PPASS
DetailsJim Storey
BLD-Final6/27/20086/27/20086/27/2008ACANC
DetailsJim Storey
BLD-Final6/18/20086/19/20086/19/2008ACANC
DetailsJim Storey
Bob Phone #: ###-####
FIRE-Final Inspection6/18/20086/19/20086/19/2008APASS
DetailsForrest France
Fire life safety okay for final pending the addition of one EM light at the south exit to be installed today per discussion. Also completed preliminary walkthrough for the remainder of area 5A-noted overdue PFE certification, missing sprinkler escutcheons, EM lighitng passed test.
BLD-Framing/Rough-in5/9/20085/9/20085/9/2008APASS
DetailsJim Storey
BLD-Framing/Rough-in5/9/20085/9/20085/9/2008APASS
DetailsJim Storey
1 hr insp. time
BLD-Conference5/2/20085/2/20085/2/2008APASS
DetailsJim Storey
recieved up date to fpp plan to reflect bi-levele switching to meet iecc and nec wiring diagram. atched to city archived set off plans.