BLD-Final | 2/3/2010 | 2/4/2010 | 2/4/2010 | P | PASS |
Tony Young
|
|
|
Rod Phone #: ###-#### see notes at energy code inspection
|
DOC - Permit Finaled | 2/4/2010 | 2/4/2010 | 2/4/2010 | P | PASS |
Tony Young
|
|
|
c of c issued,, see notes about egress in building permit notes
|
BLD-Final | 2/3/2010 | 2/3/2010 | 2/3/2010 | P | PART |
Tony Young
|
|
|
Rod Phone #: ###-#### conf only
|
BLD-Conference | 1/7/2010 | 1/8/2010 | 1/8/2010 | A | PASS |
Tony Young
|
|
|
Rod Phone #: ###-#### ?s on handrails
|
BLD-Energy code compliance | 2/23/2009 | 2/26/2009 | 2/26/2009 | P | PASS |
Tony Young
|
|
|
Rod Phone #: ###-#### upper new room is only a storage,, not per code for ceiling height or egress,, existing rooms upstairs same, but grand fathered
|
BLD-Energy code compliance | 2/18/2009 | 2/24/2009 | 2/24/2009 | A | NR |
Tony Young
|
|
|
Rod Phone #: ###-####
|
BLD-Framing/Rough-in | 2/18/2009 | 2/18/2009 | 2/18/2009 | P | PASS |
Tony Young
|
|
|
Rod Phone #: ###-####
|
BLD-Conference | 2/18/2009 | 2/18/2009 | 2/18/2009 | P | PASS |
Tony Young
|
|
|
Rod Phone #: ###-#### upper new area does not meet headroom,, contractor said that by final it will be noted on reviewed plans as only un inhabital space only,, storage,, also 2 windows will be temperd that are w/in 24" of the door
|
BLD-Wall cover | 2/10/2009 | 2/10/2009 | 2/10/2009 | P | FAIL |
Tony Young
|
|
|
Rod Phone #: ###-#### need to clarify upper story room,, no egress and not per code on headroom per 305.1 exp#3,, need temp glass in required locations,, need fireblocks at ceiling lines,, need to justify roof venting procedure,, ( at least in new section) existing roof areas only have a 2x4 for rafters,, can insulate if contractor wants too,, verify seal pack
|
BLD-Foundation | 5/7/2008 | 5/8/2008 | 5/8/2008 | A | PART |
Mike Jordan
|
|
|
rod - wall Phone #: ###-####. wip. forms up, still tying horizontal reinforcement.
|
BLD-Footing | 5/5/2008 | 5/6/2008 | 5/6/2008 | A | PASS |
Tony Young
|
|
|
rod Phone #: ###-####
|