BLD-Final | 1/30/2009 | 2/3/2009 | 2/3/2009 | P | PASS |
Tony Young
|
|
|
PATRICK Phone #: ###-####
|
DOC - Permit Finaled | 2/3/2009 | 2/3/2009 | 2/3/2009 | P | PASS |
Tony Young
|
|
|
signed paper work
|
FIRE-Final Inspection | 1/30/2009 | 2/3/2009 | 2/3/2009 | A | PASS |
Forrest France
|
|
|
Lane marking provided, structural inspector to verify lever action hardware has been installed at the pressbox exit door or provide visual indicator and signage with the keyed lock per IFC exceptions for B occupancies.
|
FIRE-Conference | 2/2/2009 | 2/2/2009 | 2/2/2009 | A | DONE |
Forrest France
|
|
|
Regarding final site inspection schedule.
|
Extend Permit 180 days | 10/13/2008 | 10/13/2008 | 10/13/2008 | P | FAIL |
Forrest France
|
|
|
See previous correction notice.
|
FIRE-Final Inspection | 9/30/2008 | 10/1/2008 | 10/1/2008 | A | FAIL |
Forrest France
|
|
|
Need to provide approved hardware at the press box exit door, missing lane marking per plans adjacent to the emergency vehicle access gate, see fire code review notes for details.
|
BLD-Conference | 9/30/2008 | 10/1/2008 | 10/1/2008 | A | NR |
Tony Young
|
|
|
patrick Phone #: ###-#### Plan reviewer SZw will meet also.. ?s on handrails, etc.
|
BLD-Final | 9/30/2008 | 10/1/2008 | 10/1/2008 | P | DONE |
Tony Young
|
|
|
patrick Phone #: ###-####
|
BLD-Final | 9/29/2008 | 9/30/2008 | 9/30/2008 | A | FAIL |
Tony Young
|
|
|
patrick Phone #: ###-#### need other signoffs,, fls, zoning, ,, need a conf on site w/ plan review,, may need more handrails
|
BLD-Concrete | 7/9/2008 | 7/10/2008 | 7/10/2008 | A | PASS |
Tom Arcoraci
|
|
|
Ron Phone #: ###-####
|
BLD-Footing | 6/25/2008 | 6/26/2008 | 6/26/2008 | A | PASS |
Dave Hannah
|
|
|
ron Phone #: ###-#### retainning wall ok to place concrete
|
BLD-Concrete | 6/12/2008 | 6/13/2008 | 6/13/2008 | P | PASS |
Mike Jordan
|
|
|
Gary Phone #: ###-####. Footings and slab on grade for dugouts.
|