BLD-Final | 6/26/2008 | 6/26/2008 | 6/26/2008 | P | PASS |
Mike Jordan
|
|
|
ok for perm occ.
|
BLD-Final | 6/25/2008 | 6/27/2008 | 6/26/2008 | A | PASS |
Forrest France
|
|
|
Fire life safety finaled.
|
FIRE-Final Inspection | 6/25/2008 | 6/26/2008 | 6/26/2008 | A | PASS |
Forrest France
|
|
|
Fire life safety is satisfactory, inspection passed.
|
FIRE-Sprinkler Rough-in | 6/25/2008 | 6/26/2008 | 6/26/2008 | A | DEFR |
Forrest France
|
|
|
Duplicate inspection request, was intended for the project related fire sprinkler permit work.
|
BLD-Other | 6/18/2008 | 6/19/2008 | 6/19/2008 | A | PART |
Dave Hannah
|
|
|
Jim Phone #: ###-#### ceiling grid ok ok to cover mec contractor will run wires to fixtures
|
BLD-Framing/Rough-in | 6/2/2008 | 6/2/2008 | 6/2/2008 | P | PASS |
Mike Jordan
|
|
|
jim Phone #: ###-####. All combustible backing has been removed, fire treated wood was installed as well as backing for the vertical grab bar.
|
BLD-Framing/Rough-in | 5/29/2008 | 6/2/2008 | 6/2/2008 | A | PART |
Mike Jordan
|
|
|
Jim; Phone #: ###-#### Internet Inspection Request from: Cathy Weisshaupt. Needs to replace backing in hc restroom with either non combustible or fire treated materials and provide additional backing for vertical grab bar. c/n posted.
|