BLD-Aging Inspection | 2/25/2009 | 2/25/2009 | 2/25/2009 | | PASS |
Jim Storey
|
|
|
|
DOC - Permit Finaled | 2/25/2009 | 2/25/2009 | 2/25/2009 | P | PASS |
Jim Storey
|
|
|
|
FIRE-Final Inspection | 6/16/2008 | 6/16/2008 | 6/16/2008 | P | PASS |
Forrest France
|
|
|
Fire life safety finaled.
|
FIRE-Final Inspection | 6/4/2008 | 6/5/2008 | 6/5/2008 | A | PASS |
Forrest France
|
|
|
Correction notice items listed at the previous inspection are finished and verified for compliance, fire life safety passed.
|
BLD-Final | 6/3/2008 | 6/4/2008 | 6/4/2008 | P | PART |
Jim Storey
|
|
|
Allen Phone #: ###-#### final ok pending fir.
|
FIRE-Final Inspection | 6/3/2008 | 6/4/2008 | 6/4/2008 | A | FAIL |
Forrest France
|
|
|
Missing the required fire extinguisher per IFC 2006, provide missing escutcheon at the pendent sprinkler head adjacent to the restrooms, will need verification that the existing fire sprinkler system is current with an annual inspection completed by a licensed fire sprinkler contractor.
|
BLD-Final | 6/2/2008 | 6/3/2008 | 6/3/2008 | P | NR |
Jim Storey
|
|
|
ALLEN Phone #: ###-####
|
BLD-Framing/Rough-in | 5/15/2008 | 5/15/2008 | 5/15/2008 | A | PASS |
Jim Storey
|
|
|
|
BLD-Framing/Rough-in | 5/13/2008 | 5/14/2008 | 5/14/2008 | A | PART |
Jim Storey
|
|
|
alan Phone #: ###-#### need ele ri insp./ move bi-level switching/ ok to start gyp upon ele aproval/ call for reinsp to verift switching.
|