BLD-Final | 6/20/2013 | 6/20/2013 | 6/20/2013 | P | DONE |
Mike Jordan
|
|
|
Contacted the contractor and told him to pick up C.O. no later than tomorrow 6-21-13.
|
BLD-Aging Inspection | 3/7/2013 | 3/7/2013 | 3/8/2013 | | DONE |
Mike Jordan
|
|
|
Needs to pick up c.o.
|
BLD-Aging Inspection | 11/26/2012 | 11/26/2012 | 11/30/2012 | | DONE |
Mike Jordan
|
|
|
Needs to pick up c.o.
|
BLD-Final | 8/8/2012 | 8/9/2012 | 8/9/2012 | A | PASS |
Mike Jordan
|
|
|
morgan please call 30 min before going out he would like to be there Phone #: ###-####. Ok for perm occ.
|
BLD-Final | 4/5/2012 | 4/6/2012 | 4/6/2012 | A | PART |
Mike Jordan
|
|
|
Morgan Phone #: ###-####. Ok for temp occ. Will be ok for perm occ once zoning has finaled.
|
BLD-Conference | 4/4/2012 | 4/4/2012 | 4/4/2012 | P | DONE |
Mike Jordan
|
|
|
MORGAN PLEASE CALL BEFORE GOING OUT Phone #: ###-####. Walk through with contractor.
|
FIRE-Final Inspection | 4/2/2012 | 4/2/2012 | 4/2/2012 | P | PASS |
Troy Cobbley
|
|
|
Life safety passed. The builder has installed "tabs" on the lower leaf to operate the upper leaf as a single unit.
|
BLD-Final | 3/27/2012 | 3/28/2012 | 3/28/2012 | P | NR |
Mike Jordan
|
|
|
morgan Phone #: ###-####
|
FIRE-Final Inspection | 3/27/2012 | 3/28/2012 | 3/28/2012 | A | FAIL |
Troy Cobbley
|
|
|
Provide building address on both sides of the building as discussed, provide no parking signage per review note #4, provide annual inspection for the fire extinguishers, the surface mounted flush bolts need to be removed from all doors. The upper leaf needs to operate in tandum with the lower leaf when operated. See review notes #6 and #8.
|
BLD-Energy code compliance | 3/6/2012 | 3/7/2012 | 3/7/2012 | A | PASS |
Mike Jordan
|
|
|
insulation on the addition in the back//Morgan Phone #: ###-####
|
BLD-Framing/Rough-in | 3/2/2012 | 3/2/2012 | 3/2/2012 | P | PASS |
Mike Jordan
|
|
|
Morgan-In the additon on the back area please Phone #: ###-####
|
BLD-Wall Bracing | 2/7/2012 | 2/7/2012 | 2/7/2012 | P | PASS |
Mike Jordan
|
|
|
Phone #: 2088672245 >> Inspection requested via mobile web by Morgan. Exterior walls and roof ok to cover on phase 2.
|
BLD-Energy code compliance | 1/25/2012 | 1/26/2012 | 1/26/2012 | A | PASS |
Mike Jordan
|
|
|
MORGAN Phone #: ###-####. Ok to rock except for doggie wash area, until plumbing and plan mod has been approved.
|
BLD-Framing/Rough-in | 1/23/2012 | 1/23/2012 | 1/23/2012 | P | PART |
Mike Jordan
|
|
|
morgan Phone #: ###-####. Framing ok as per additional enginnering that has been provided. Will be submitted with plan mod.
|
BLD-Framing/Rough-in | 1/17/2012 | 1/18/2012 | 1/18/2012 | P | NR |
Mike Jordan
|
|
|
morgan Phone #: ###-####. Needs to complete airseal package. Also needs to submit a plan mod showhing the addition of the dog wash area and additional engineering for the modified truss bearing and main beam running down the middle of main portion of "phase 1" of building.
|
BLD-Foundation | 1/9/2012 | 1/10/2012 | 1/10/2012 | A | PASS |
Mike Jordan
|
|
|
Phone #: 6951097 >> Inspection requested via mobile web by Adam
|
BLD-Footing | 1/6/2012 | 1/9/2012 | 1/9/2012 | A | PASS |
Mike Jordan
|
|
|
Phone #: 6951097 >> Inspection requested via mobile web by Adam . North addition permiter footings only. Contractor to expose north footing line at existing building for further inspection.
|
BLD-Footing | 1/5/2012 | 1/6/2012 | 1/6/2012 | P | FAIL |
Mike Jordan
|
|
|
Phone #: 6951097 >> Inspection requested via mobile web by Adam . Correction notice was issued stating to have engineer of record provide additional details for new footing connection to existing footing and to evaluate and provide footing details for north footing line at exisiting building portion, no footing has been placed at this location. Also needs to run compactor over new footing portion that has been excavated.
|
BLD-Other | 12/19/2011 | 12/19/2011 | 12/19/2011 | P | PART |
Mike Jordan
|
|
|
###-#### - morgan - shear inspection . exterior shear walls and roof only.
|
BLD-Other | 12/15/2011 | 12/16/2011 | 12/16/2011 | A | FAIL |
Mike Jordan
|
|
|
morgan - shear inspection - please call 1/2 hr prior so he can meet you there Phone #: ###-####. Needs to provide staple conversion chart from engineer, Roof diapdragm also stapled, needs to be nailed. Also needs to install all blocking and straps as noted on approved plans.
|
BLD-Conference | 10/24/2011 | 10/24/2011 | 10/24/2011 | P | DONE |
Mike Jordan
|
|
|
morgan Phone #: ###-#### please call 30 min before going out so he can meet you there.
|
BLD-Conference | 10/19/2011 | 10/19/2011 | 10/19/2011 | P | DONE |
Mike Jordan
|
|
|
Spoke to morgan with morgan builders? Will set up a conferance on monday morning to met on the jobsite.
|
BLD-Other | 8/15/2011 | 8/15/2011 | 8/15/2011 | A | DONE |
Mike Jordan
|
|
|
Ok to reactivate permit upon receipt of 2 hour admin fee.. Bob A.
|
BLD-Aging Inspection | 8/11/2011 | 8/11/2011 | 8/12/2011 | | CANC |
Mike Jordan
|
|
|
|
DOC - Permit Expired | 8/12/2011 | 8/12/2011 | 8/12/2011 | A | PASS |
Mike Jordan
|
|
|
No work or required inspections have been called in. Permit is expired.
|
BLD-Conference | 4/6/2011 | 4/6/2011 | 4/6/2011 | P | DONE |
Mike Jordan
|
|
|
Spoke to owner a noted to him that he 180 days to schedule a required inspection or permit would expire.
|
BLD-Aging Inspection | 1/14/2011 | 1/14/2011 | 1/14/2011 | | PASS |
Mike Jordan
|
|
|
Noted plumbing underground work being done.
|
BLD-Aging Inspection | 11/4/2010 | 11/4/2010 | 11/9/2010 | | DONE |
Mike Jordan
|
|
|
Spoke to Datum construction, they noted that owner to start doing some underground plumbing work. Noted to Datum that work would have to begin prior to jan 1st. of 2011, due to new code cycle and original permit issued in 2008.
|
BLD-Conference | 3/16/2010 | 3/19/2010 | 3/19/2010 | A | PASS |
Mike Jordan
|
|
|
bill - ###-#### - please call 1/2 hr prior
|
BLD-Foundation | 9/28/2009 | 9/29/2009 | 9/29/2009 | A | PART |
Mike Jordan
|
|
|
East, west and south Stemwalls ok. Noted that contractor did not place north interior footing at this time.
|
BLD-Foundation | 9/28/2009 | 9/28/2009 | 9/28/2009 | P | FAIL |
Mike Jordan
|
|
|
jason Phone #: ###-####. No approved plans on site. Called Jason. Inspection rescheduled fro 9-29-09 in the am.
|
BLD-Footing | 9/17/2009 | 9/17/2009 | 9/17/2009 | P | PART |
Mike Jordan
|
|
|
bill Phone #: ###-####. South, east and west perimeter footings. North footing on plan shows as an interior footing, with Three additional wings to thr north. Contractor has constructed this footing as an exterir footing. Owner wants to not complete the three wings to the north at this time due to financial constraints but is doing main portion to keep bldg. permit active. Noted to contractor that no vertical construction would be allowed until footings and foundation for aditional wings are complete or a plan modification is submitted with new structural calcs. showing the nrth wall as an exterior wall.
|
Extend Permit 180 days | | 8/6/2009 | 8/6/2009 | | DONE |
Bob Archibald
|
|
|
Amended to reflect actual expiration date from 3/22/09 when permit would have expired w/out any activity.
|
Extend Permit 180 days | | 2/18/2009 | 2/18/2009 | | DONE |
|
|
|
Ok per George Slane to extend permit for 180 days. (see letter that was scaned and attached )
|
BLD-Aging Inspection | 12/31/2008 | 12/31/2008 | 1/5/2009 | | PASS |
Mike Jordan
|
|
|
|