BLD-Final | 5/5/2009 | 5/5/2009 | 5/5/2009 | P | PASS |
Mike Jordan
|
|
|
andy - please call 1/2 hr prior so he can meet you there Phone #: ###-####
|
DOC - Permit Finaled | 5/5/2009 | 5/5/2009 | 5/5/2009 | P | PASS |
Mike Jordan
|
|
|
Letter of compliance was issued for shell.
|
FIRE-Final Inspection | 2/26/2009 | 2/27/2009 | 2/27/2009 | A | PASS |
Troy Cobbley
|
|
|
life safety passed. The duct smoke detectors have been removed.
|
FIRE-Final Inspection | 2/25/2009 | 2/26/2009 | 2/26/2009 | A | FAIL |
Troy Cobbley
|
|
|
Provide building address, repair the exit discharge light at the southeast corner and either provide correctly installed and functional duct smoke detectors or remove them.
|
BLD-Framing/Rough-in | 2/24/2009 | 2/25/2009 | 2/25/2009 | A | PASS |
Mike Jordan
|
|
|
Andy Phone #: ###-####
|
BLD-Conference | 1/15/2009 | 1/15/2009 | 1/15/2009 | P | PASS |
Mike Jordan
|
|
|
andy Phone #: ###-####
|
BLD-Energy code compliance | 1/9/2009 | 1/9/2009 | 1/9/2009 | P | PASS |
Mike Jordan
|
|
|
Ok to cover rotunda area.
|
BLD-Energy code compliance | 12/9/2008 | 12/9/2008 | 12/10/2008 | A | CANC |
Mike Jordan
|
|
|
|
BLD-Conference | 11/25/2008 | 11/26/2008 | 11/26/2008 | A | DONE |
Mike Jordan
|
|
|
ANDY Phone #: ###-####
|
BLD-Framing/Rough-in | 10/14/2008 | 10/14/2008 | 10/14/2008 | P | PART |
Mike Jordan
|
|
|
andy - sheeting Phone #: ###-####. Exterior shear nailing on walls and roof only. ok.
|
BLD-Foundation | 9/5/2008 | 9/5/2008 | 9/5/2008 | P | PART |
Mike Jordan
|
|
|
andy Phone #: ###-####. Perimeter stemwall. Noted special insp.
|
BLD-Footing | 9/2/2008 | 9/2/2008 | 9/2/2008 | P | PASS |
Jim Storey
|
|
|
Andy Phone #: ###-#### si report ok
|