BLD-Final | 7/1/2008 | 7/2/2008 | 7/2/2008 | A | PASS |
Dave Hannah
|
|
|
Scheduled by a contractor via Hello! on 7/1/2008 at 9:58:31 AM. Contact: ###-####. ok for perm occ
|
FIRE-Final Inspection | 7/1/2008 | 7/2/2008 | 7/2/2008 | P | PASS |
Forrest France
|
|
|
Fire life safety passed.
|
FIRE-Final Inspection | 7/1/2008 | 7/1/2008 | 7/1/2008 | P | PASS |
Forrest France
|
|
|
Fire life safety finaled.
|
BLD-Final | 7/1/2008 | 7/1/2008 | 7/1/2008 | P | CANC |
Dave Hannah
|
|
|
Scheduled by a contractor via Hello! on 7/1/2008 at 9:59:57 AM. Contact: ###-####.
|
FIRE-Alarm Testing | 6/30/2008 | 7/1/2008 | 7/1/2008 | A | PASS |
Forrest France
|
|
|
Fire life safety inspection passed, one missing fire sprinkler escutcheon replaced while on site, noted project related fire sprinkler permit needs requested for final as well as correct inspection type called in for the BLD permit as "fire final" to ensure accurate documentation.
|
BLD-Wall cover | 6/17/2008 | 6/18/2008 | 6/18/2008 | A | PART |
Dave Hannah
|
|
|
Scheduled by a contractor via Hello! on 6/17/2008 at 12:54:17 PM. Contact: ###-####.ok to cover ceiling
|
BLD-Final | 6/11/2008 | 6/12/2008 | 6/13/2008 | P | CANC |
Dave Hannah
|
|
|
Scheduled by a contractor via Hello! on 6/11/2008 at 1:57:29 PM. Contact: ###-####.
|
BLD-Other | 6/13/2008 | 6/13/2008 | 6/13/2008 | P | PART |
Dave Hannah
|
|
|
Scheduled by a contractor via Hello! on 6/11/2008 at 1:57:29 PM. Contact: ###-####.ceiling grid need to get other trades above grid oked also needs to clip or place spreader bars at ends
|
BLD-Framing/Rough-in | 5/29/2008 | 5/30/2008 | 5/30/2008 | P | PASS |
Dave Hannah
|
|
|
Scheduled by a contractor via Hello! on 5/29/2008 at 2:00:29 PM. Contact: ###-####.ok to cover walls
|