BLD-Final | 5/21/2009 | 5/21/2009 | 5/21/2009 | P | PASS |
Tom Arcoraci
|
|
|
cambria Phone #: ###-#### ok at this time
|
DOC - Permit Finaled | 5/21/2009 | 5/21/2009 | 5/21/2009 | P | PASS |
Tom Arcoraci
|
|
|
|
BLD-Energy code compliance | 10/23/2008 | 10/23/2008 | 10/23/2008 | P | PASS |
Jim Storey
|
|
|
CAMBRIA Phone #: ###-####
|
BLD-Conference | 10/20/2008 | 10/20/2008 | 10/20/2008 | P | PASS |
Jim Storey
|
|
|
cambria Note: please call 1/2 hr prior to inspection to meet with Phone #: ###-####
|
BLD-Energy code compliance | 9/29/2008 | 9/29/2008 | 9/29/2008 | P | PASS |
Dave Hannah
|
|
|
cambria Note:please call 1/2 hr prior to inspection Phone #: ###-####
|
BLD-Framing/Rough-in | 9/16/2008 | 9/17/2008 | 9/17/2008 | P | PART |
Jim Sly
|
|
|
cambria Note: Please call 1/2 hr prior to inspection Phone #: ###-#### Framing OK......Need studs above warm wall to allow for vertical garage separation ( to roof deck)
|
BLD-Framing/Rough-in | 9/12/2008 | 9/15/2008 | 9/15/2008 | A | NR |
Mike Jordan
|
|
|
Cambria Phone #: ###-####. Needs other trades ri insp. first.
|
BLD-Conference | 8/12/2008 | 8/12/2008 | 8/12/2008 | P | DONE |
Mike Jordan
|
|
|
Cambria Phone #: ###-####
|
BLD-Conference | 8/12/2008 | 8/12/2008 | 8/12/2008 | A | DONE |
Mike Jordan
|
|
|
|
BLD-Conference | 7/14/2008 | 7/14/2008 | 7/14/2008 | P | PASS |
Tom Arcoraci
|
|
|
2 pm
|
BLD-Conference | 7/14/2008 | 7/14/2008 | 7/14/2008 | A | PASS |
Tom Arcoraci
|
|
|
|