Permit Information
Permit NumberBLD08-01278
StatusFinaled
Name HAYWARD HOMES LLC
Site Address 615 N 9TH ST
Project NameCAPITOL CHRISTIAL CHURCH
Customer Number 
ePlanReviewNo
Description
(CAPITOL CITY CHRISTIAN CHURCH) Permit scope of work includes: install new exterior sidewalks on the church grounds, demo non-bearing partition walls, construction of interior non-bearing rated walls to create an area for the new lift, and install a new interior accessible lift between basement and 1st floor of an existing church per approved plans and CZC08-00100. The lift is allowed as an accessible route per section 3409.8.3 of the 2006 IBC and the basement is not required to have an accessible means of egress per section 1007.1 Excetion #1of the 2006 IBC. This building is not sprinklered.**TLW**
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Final10/14/200810/15/200810/15/2008APASS
DetailsTony Young
jerry Phone #: ###-####
BLD-Final10/15/200810/15/200810/15/2008PPASS
DetailsTony Young
jerry Phone #: ###-####
DOC - Permit Finaled10/15/200810/15/200810/15/2008PPASS
DetailsTony Young
FIRE-Final Inspection10/15/200810/15/200810/15/2008PPASS
DetailsTroy Cobbley
fire life safety completed.KR
BLD-Framing/Rough-in8/4/20088/4/20088/4/2008PPASS
DetailsTony Young
Gary Phone #: ###-####
BLD-Conference7/28/20087/28/20087/28/2008PPART
DetailsTony Young
larry - 1:00 apt Phone #: ###-####
met architect and contractor on site,, old building,, some code mods are needed to comply w/ overall wellfare of job,," lesser of two evils",, head room issues etc..