BLD-Final | 1/13/2009 | 1/13/2009 | 1/13/2009 | P | PASS |
Dave Hannah
|
|
|
Conrad-flying into town and will be here approx 9:30 am Phone #: ###-#### ok for perm occ
|
BLD-Final | 1/13/2009 | 1/13/2009 | 1/13/2009 | A | PASS |
Dave Hannah
|
|
|
Conrad-flying into town and will be here approx 9:30 am Phone #: ###-####
|
FIRE-Final Inspection | 1/12/2009 | 1/13/2009 | 1/13/2009 | A | PASS |
Forrest France
|
|
|
Fire life safety inspection passed, correction items verified for completion.
|
BLD-Final | 1/12/2009 | 1/12/2009 | 1/13/2009 | P | NR |
Dave Hannah
|
|
|
Conrad-flying into town and will be here approx 9:30 am Phone #: ###-####
|
FIRE-Conference | 1/7/2009 | 1/7/2009 | 1/7/2009 | P | DONE |
Forrest France
|
|
|
Regarding actions needed for permanent certificate of occupancy.
|
FIRE-Conference | 12/30/2008 | 12/30/2008 | 12/30/2008 | P | DONE |
Troy Cobbley
|
|
|
A fire alarm quick permit (FIR08-00732) was issued, inspected and passed for the addition of in-duct detectors at the vertical shaft between the 5th and 6th floors. It appears that the project related FIR08-00517 is still in the issued status.
|
BLD-Framing/Rough-in | 10/21/2008 | 10/21/2008 | 10/22/2008 | P | PASS |
Dave Hannah
|
|
|
conrad Phone #: ###-#### saft ok to cover 6th floor
|
BLD-Framing/Rough-in | 10/16/2008 | 10/17/2008 | 10/20/2008 | P | PART |
Dave Hannah
|
|
|
Scheduled via mobile device. Name: conrad Phone #: 2067936516 ok to cover ext of shaft
|
BLD-Final | 10/3/2008 | 10/3/2008 | 10/3/2008 | P | PART |
Dave Hannah
|
|
|
per dave hannah ok for temp occ talked with forest with fire hes ok other trades ok george has a letter from contractor about shaft they will finish in next two weeks
|
BLD-Other | 9/26/2008 | 9/29/2008 | 10/1/2008 | A | PART |
Dave Hannah
|
|
|
Scheduled by a contractor via Hello! on 9/26/2008 at 3:21:05 PM. Contact: ###-####.ok to move onto the 4th and 5th floors still need to clean up sevel areas and items
|
FIRE-Final Inspection | 9/30/2008 | 9/30/2008 | 9/30/2008 | P | PART |
Forrest France
|
|
|
Fire life safety final pending project related fire sprinkler permit final for field ceiling tile installation at conference rooms on the 4th,5th and 6th floors. Previous c/n items are finished.
|
FIRE-Final Inspection | 9/29/2008 | 9/30/2008 | 9/30/2008 | A | FAIL |
Forrest France
|
|
|
Need to install one additional exit sign and provide three EM lights per plan at the multipurpose room on the 4th floor, noted missing door hardware at one office 4th floor, repair one EM light at the 5th floor, repair four emergency lights at the 6th floor-one at the open office north side, one in the cable room and two at the server room.
|
FIRE-Final Inspection | 9/26/2008 | 9/26/2008 | 9/26/2008 | P | FAIL |
Troy Cobbley
|
|
|
This inspection was for the 4th and 5th floors only. Replace the painted sprinkler heads on the 5th floor, provide the missing canopies for all of the heads on the 4th and 5th floors, remove the "tin foil" from the heads on the 4th and 5th floors, repair the inoperative fire/smoke damper on the 4th floor, the 5th floor restroom a/v's are mounted but the walls have no paint/finish (protect from paint), main lobby exit/emergency light is broken on the 4th floor, Relocate the exit sign/emergency light in the 4th floor reception away from the pendant sprinkler head, provide exit sign/emergency lights at atleast one exit from each of the Multipurpose rooms on the 4th floor and provide an occupant load sign (90) for the 4th floor multipurpose room.
|
BLD-Final | 9/26/2008 | 9/26/2008 | 9/26/2008 | P | FAIL |
Jim Storey
|
|
|
Dave- call 30 mins prior to going Phone #: ###-#### exit path must be complet/ floor penatrations sealed.
|
BLD-Framing/Rough-in | 9/25/2008 | 9/26/2008 | 9/26/2008 | A | PASS |
Mike Jordan
|
|
|
Conrad- 4th floor, ceiling tile Phone #: ###-####. ceiling grid 4th floor ok.
|
BLD-Final | 9/24/2008 | 9/25/2008 | 9/26/2008 | P | NR |
Dave Hannah
|
|
|
Conrad Phone #: ###-####
|
FIRE-Final Inspection | 9/24/2008 | 9/25/2008 | 9/25/2008 | A | NR |
Forrest France
|
|
|
Need project related fire alarm and sprinkler permit work finals prior to building life safety approval, project is not in condition for final at this time.
|
BLD-Framing/Rough-in | 9/22/2008 | 9/22/2008 | 9/22/2008 | P | PART |
Dave Hannah
|
|
|
conrad - ceiling grid wires Phone #: ###-#### ok to cover ceiling on 5th floor
|
BLD-Final | 9/18/2008 | 9/19/2008 | 9/20/2008 | P | PART |
Dave Hannah
|
|
|
conrad Phone #: ###-#### ok to cover ceiling also ok to occ the 6th floor
|
FIRE-Final Inspection | 9/18/2008 | 9/19/2008 | 9/19/2008 | A | PART |
Troy Cobbley
|
|
|
The sixth floor was given a temporary for the life safety with sam rogers permission until the fire alarm issues have been taken care of and the two conference rooms which are already in the process of remodeling are done and life safety items verified.
|
BLD-Other | 9/18/2008 | 9/19/2008 | 9/19/2008 | A | FAIL |
Dave Hannah
|
|
|
Conrad- ceiling tile Phone #: ###-####
|
FIRE-Final Inspection | 9/18/2008 | 9/19/2008 | 9/19/2008 | P | CANC |
Forrest France
|
|
|
conrad Phone #: ###-####
|
BLD-Conference | 9/18/2008 | 9/18/2008 | 9/18/2008 | P | CANC |
Dave Hannah
|
|
|
|
FIRE-Conference | 9/15/2008 | 9/15/2008 | 9/15/2008 | P | DONE |
Forrest France
|
|
|
Fire life safety conference, Conrad Phone #: ###-####
|
BLD-Conference | 8/27/2008 | 8/27/2008 | 8/27/2008 | P | DONE |
Dave Hannah
|
|
|
conrad - 11:30 Phone #: ###-#### meet at 1:30 pm on site
|
BLD-Conference | 8/25/2008 | 8/27/2008 | 8/27/2008 | A | CANC |
Dave Hannah
|
|
|
conrad - 11:30 Phone #: ###-#### moved to 1:30 pm
|
BLD-Framing/Rough-in | 8/20/2008 | 8/20/2008 | 8/21/2008 | P | PART |
Dave Hannah
|
|
|
conrad - 6th floor Phone #: ###-#### ok to cover walls
|
BLD-Framing/Rough-in | 8/11/2008 | 8/12/2008 | 8/13/2008 | P | PART |
Dave Hannah
|
|
|
Conrad Phone #: ###-#### ok to cover on walls on 5th floor
|
BLD-Framing/Rough-in | 8/11/2008 | 8/12/2008 | 8/12/2008 | P | CANC |
|
|
|
Conrad Phone #: ###-####
|
BLD-Framing/Rough-in | 8/6/2008 | 8/7/2008 | 8/7/2008 | A | PART |
Dave Hannah
|
|
|
Conrad Phone #: ###-#### holes in floor fire stopped ok to cover walls on 4th fl
|
BLD-Framing/Rough-in | 8/6/2008 | 8/6/2008 | 8/7/2008 | P | PART |
Dave Hannah
|
|
|
conrad Note: 4th floor please call 1/2 hr prior to inspection to get in Phone #: ###-#### walls ok but needs to seal holes in floor
|