BLD-Final | 8/26/2009 | 8/27/2009 | 8/27/2009 | A | PASS |
Jim Sly
|
|
|
Carol- call 30 mins prior to going for access Phone #: ###-#### C/C issued
|
DOC - Permit Finaled | 8/27/2009 | 8/27/2009 | 8/27/2009 | P | PASS |
Jim Sly
|
|
|
|
BLD-Final | 8/26/2009 | 8/26/2009 | 8/26/2009 | P | CANC |
Jim Sly
|
|
|
|
BLD-Energy code compliance | 8/14/2008 | 8/15/2008 | 8/18/2008 | A | PASS |
Jim Sly
|
|
|
dave Phone #: ###-####
|
BLD-Framing/Rough-in | 8/13/2008 | 8/14/2008 | 8/14/2008 | A | PASS |
Jim Sly
|
|
|
Dave- call 30 min prior to going Phone #: ###-####
|
BLD-Framing/Rough-in | 7/31/2008 | 7/31/2008 | 7/31/2008 | P | PASS |
Jim Storey
|
|
|
Mike Phone #: ###-#### c/n made ok
|
BLD-Framing/Rough-in | 7/29/2008 | 7/30/2008 | 7/30/2008 | A | FAIL |
Jim Sly
|
|
|
Dave Phone #: ###-#### Plumbers Compromised floor joists.....talk to Mike....Move toilet drain beyond bearing point (N wall) Add 2x8 to ea. side of 2 joists and block.
|
BLD-Framing/Rough-in | 7/29/2008 | 7/29/2008 | 7/29/2008 | P | CANC |
Jim Sly
|
|
|
Scheduled by a contractor via Hello! on 7/29/2008 at 10:30:29 AM. Contact: ###-####.
|