Information based on query as of Wednesday, July 17, 2024.
Permit Information
Permit NumberBLD08-01454
StatusFinaled
Name DATUM CONSTRUCTION MANAGEMENT INC
Site Address 909 E PARKCENTER BLVD
Project NameALBERTSONS #169
Customer Number 
ePlanReviewNo
Description
(ALBERTSONS - INTERIOR REMODEL & MINOR EXTERIOR UPGRADES) To perform a phased interior remodel and minor exterior upgrades to an existing 50,724 sq.ft. retail grocery store per approved plans. Interior work includes upgrade and remodel throughout with installation of 2 new walk in coolers in bakery and wine sales, minor exterior upgrades to walls and parking area on front and back of store, and installation of new refrigeration units on the roof per approved plans and attached engineering on file. NOTE: This building is fully fire sprinklered for area increase. All alterations and modifications to the fire sprinkler system shall be per NFPA #13 as regulated by the fire department. **SRZ**
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Final4/13/20094/14/20094/15/2009PPASS
DetailsJim Storey
Eric Phone #: ###-####
DOC - Permit Finaled4/15/20094/15/20094/15/2009PPASS
DetailsJim Storey
FIRE-Final Inspection4/13/20094/14/20094/14/2009APASS
DetailsForrest France
Noted correction items repaired, fire life safety finaled.
FIRE-Final Inspection4/10/20094/13/20094/13/2009AFAIL
DetailsForrest France
Delete keyed locking hardware at the beer cooler door, provide approved hardware or remove the exit sign if not required at the stock room freight door.
BLD-Aging Inspection4/6/20094/6/20094/6/2009 PASS
DetailsJim Storey
wip with fire final insp,
FIRE-Conference2/4/20092/4/20092/4/2009PDONE
DetailsForrest France
Discussed fire life safety items needed for final project approval, noted the existing hood suppression system is overdue certification and inspection.
BLD-Framing/Rough-in1/29/20091/29/20091/29/2009APASS
DetailsJim Storey
Scheduled by a contractor via Hello! on 1/29/2009 at 5:13:37 AM. Contact: ###-####.
BLD-Framing/Rough-in1/21/20091/21/20091/21/2009APASS
DetailsJim Storey
Scheduled by a contractor via Hello! on 1/21/2009 at 6:15:53 AM. Contact: ###-####. south east cooller area ok.
BLD-Framing/Rough-in11/10/200811/10/200811/10/2008ANH
DetailsTom Arcoraci
Scheduled by a contractor via Hello! on 11/10/2008 at 6:35:06 AM. Contact: ###-####. no answer on phone left message
BLD-Framing/Rough-in11/5/200811/5/200811/6/2008PNH
DetailsJim Storey
Scheduled by a contractor via Hello! on 11/5/2008 at 5:15:11 AM. Contact: ###-####. no call back no one on site no plans found.
BLD-Framing/Rough-in10/30/200810/30/200810/30/2008PPASS
DetailsJim Storey
Scheduled by a contractor via Hello! on 10/30/2008 at 6:01:29 AM. Contact: ###-####.
BLD-Other10/24/200810/28/200810/28/2008APASS
DetailsClint A Smith
Refer to ESC08-00941
BLD-Other10/24/200810/24/200810/24/2008AFAIL
DetailsClint A Smith
Notice of Correction:
Secure an ESC permit.
Protect the storm drain in the back parking lot by the staging area.
Failure to comply by 10/27/08 PM, a Stop Work Order will be issued.