BLD-Final | 3/2/2009 | 3/2/2009 | 3/2/2009 | P | PASS |
Tony Young
|
|
|
zane Phone #: ###-#### signed paperwork
|
BLD-Final | 2/18/2009 | 2/19/2009 | 2/19/2009 | A | PART |
Tony Young
|
|
|
jesse Phone #: ###-#### temp occ. ok ,,, need hand rails on exit route stairs through fence
|
FIRE-Final Inspection | 2/18/2009 | 2/19/2009 | 2/19/2009 | A | PASS |
Troy Cobbley
|
|
|
Life safety passed. I notified Gordon about my concerns with a fire retardant that has to be re-applied every three months and is to be the owners responcibility.
|
BLD-Final | 1/28/2009 | 1/29/2009 | 1/29/2009 | A | NR |
Tony Young
|
|
|
jessie Phone #: ###-#### need f/l/s 1st
|
FIRE-Final Inspection | 1/28/2009 | 1/28/2009 | 1/29/2009 | P | FAIL |
Troy Cobbley
|
|
|
Repair the electrical panel covers and provide latching doors as per the original fire dept correction notice. Repair the existing exit sign at the east bar area. Provide panic hardware on both doors at teh stir enclosure as discussed. Provide an occupant load sign of 60 for the sports bar area. Provide the fire retardant as per the original fire dept correction notice. Rewire the southwest exit sign to unswitched power.
|
BLD-Final | 1/28/2009 | 1/28/2009 | 1/28/2009 | P | NR |
Tony Young
|
|
|
jessie Phone #: ###-####
|
BLD-Final | 1/26/2009 | 1/27/2009 | 1/28/2009 | P | NR |
Tony Young
|
|
|
jessie Phone #: ###-#### need f/l/s 1st,, conf on job
|
BLD-Conference | 1/16/2009 | 1/16/2009 | 1/16/2009 | P | PART |
Tony Young
|
|
|
Jesse Phone #: ###-#### conf on stairs, exits, final
|
BLD-Concrete | 1/15/2009 | 1/16/2009 | 1/16/2009 | A | NR |
Tony Young
|
|
|
Jesse Phone #: ###-####
|
BLD-Other | 1/6/2009 | 1/6/2009 | 1/6/2009 | P | PASS |
Tony Young
|
|
|
jessie Note: speciality fasterner - on montegle bay Phone #: ###-#### anchors for posts in edge of deck on east side,, ok
|
BLD-Other | 12/17/2008 | 12/18/2008 | 12/18/2008 | A | PASS |
Mike Jordan
|
|
|
jesse - clearance - ledger - fastners Phone #: ###-####. Clearance under west deck ok. Also inspected ledger connections and fasteners on east deck. ok to cover both decks.
|
BLD-Footing | 12/15/2008 | 12/16/2008 | 12/16/2008 | A | PART |
Tony Young
|
|
|
jesse Phone #: ###-#### wip. 3 deck ftgs
|
BLD-Conference | 12/11/2008 | 12/12/2008 | 12/15/2008 | A | PART |
Tony Young
|
|
|
zane Phone #: ###-#### ledger/ joists ok on west deck after getting clearance on underside of joists
|
BLD-Conference | 12/10/2008 | 12/11/2008 | 12/12/2008 | P | CANC |
Tony Young
|
|
|
zane Phone #: ###-#### ledger/ joists
|
BLD-Footing | 12/10/2008 | 12/10/2008 | 12/10/2008 | P | NR |
Tony Young
|
|
|
zane Phone #: ###-#### need plans,, ledger not ftgs
|
BLD-Conference | 12/2/2008 | 12/3/2008 | 12/3/2008 | A | PART |
Tony Young
|
|
|
zane Phone #: ###-#### walk through conf,, need to get fix from struct eng or architect on attatchment to existing ftg,, RFI
|
BLD-Conference | 12/2/2008 | 12/2/2008 | 12/2/2008 | P | NH |
Tony Young
|
|
|
zane Phone #: ###-####
|
BLD-Footing | 12/1/2008 | 12/2/2008 | 12/2/2008 | A | NH |
Tony Young
|
|
|
zane Phone #: ###-####
|
BLD-Aging Inspection | 11/21/2008 | 11/21/2008 | 11/23/2008 | | PEND |
Tony Young
|
|
|
|