BLD-Final | 11/24/2008 | 11/25/2008 | 11/25/2008 | P | PASS |
Tom Arcoraci
|
|
|
walter Note: please call 1/2 prior to inspection Phone #: ###-####
|
DOC - Permit Finaled | 11/25/2008 | 11/25/2008 | 11/25/2008 | P | PASS |
Tom Arcoraci
|
|
|
|
BLD-Energy code compliance | 10/9/2008 | 10/9/2008 | 10/9/2008 | P | PASS |
Mike Jordan
|
|
|
Walter Phone #: ###-####
|
BLD-Framing/Rough-in | 10/2/2008 | 10/3/2008 | 10/3/2008 | P | PASS |
Jim Storey
|
|
|
walter Phone #: ###-####
|
BLD-Framing/Rough-in | 10/2/2008 | 10/2/2008 | 10/2/2008 | P | NR |
Mike Jordan
|
|
|
Walter Phone #: ###-####. Needs to provide approved plans and truss engineering. Also needs to complete the air seal package.
|
BLD-Other | 8/15/2008 | 8/15/2008 | 8/18/2008 | P | PEND |
Jim Sly
|
|
|
stem wall inspection//early as possible because want to pour concrete this am/please call Walter ###-#### to arrange Poured W/O inspection
|
BLD-Footing | 8/11/2008 | 8/12/2008 | 8/12/2008 | A | PASS |
Jim Sly
|
|
|
Scheduled by a contractor via Hello! on 8/11/2008 at 3:26:44 PM. Contact: ###-####.
|