BLD-Final | 9/11/2008 | 9/12/2008 | 9/12/2008 | A | PASS |
Dave Hannah
|
|
|
Scheduled by a contractor via Hello! on 9/11/2008 at 5:27:46 PM.
|
DOC - Permit Finaled | 9/12/2008 | 9/12/2008 | 9/12/2008 | P | PASS |
Dave Hannah
|
|
|
|
BLD-Framing/Rough-in | 8/7/2008 | 8/8/2008 | 8/9/2008 | P | PASS |
Dave Hannah
|
|
|
Scheduled by a contractor via Hello! on 8/7/2008 at 8:32:06 AM. Contact: ###-####. ok to cover
|
BLD-Conference | 8/4/2008 | 8/5/2008 | 8/5/2008 | A | PASS |
Dave Hannah
|
|
|
Scheduled by a contractor via Hello! on 8/4/2008 at 4:36:05 PM.
|
BLD-Conference | 7/30/2008 | 7/30/2008 | 7/30/2008 | P | DONE |
Jim Sly
|
|
|
Scheduled by a contractor via Hello! on 7/30/2008 at 8:49:26 AM. Contact: ###-####. OK'd Battery Smoke Det.......
|