BLD-Final | 9/22/2008 | 9/23/2008 | 9/23/2008 | P | PASS |
Dave Hannah
|
|
|
chuck-after 3:45 if possible or please call to arrange time Phone #: ###-#### ok for perm occ
|
FIRE-Final Inspection | 9/15/2008 | 9/22/2008 | 9/22/2008 | P | PASS |
Troy Cobbley
|
|
|
All corrections made per Forrest last inspection.KR
|
BLD-Final | 9/5/2008 | 9/8/2008 | 9/9/2008 | P | NR |
Dave Hannah
|
|
|
please after 3:45 and call when on way//Chuck ###-#### needs to final fires c/n first
|
FIRE-Final Inspection | 9/5/2008 | 9/8/2008 | 9/8/2008 | P | FAIL |
Forrest France
|
|
|
Provide one certified/tagged fire extinguisher and post as discussed, remove the manual thumbturn at the main entry/exit door and provide signage.
|