Information based on query as of Saturday, June 29, 2024.
Permit Information
Permit NumberBLD08-01843
StatusExpired
Name WARNER CONSTRUCTION
Site Address 1500 E SHENANDOAH DR
Project Name 
Customer Number 
ePlanReviewNo
Description
"10-21-2008THIS PROJECT IS MODIFIED TO REFLECT THE REDUCTION OF THE SCOPE OF THIS PERMIT. THE PROJECT WILL BE CONFINED MAINLY TO THE KITCHEN AREA INCLUDING A REDUCTION OF THE EXTERIOR WALL OPENINGS IN TIS AREA; ELIMINATING THE FIREPLACE; EXTERIOR DECK WORK. tHE WALL WILL STILL BE REMOVED IN THE LIVINGROOM ENTRY HALL AREA AND THE RANGE AND SINK WILL BE TRANSPOSED. THIS REDUCTION IN PROJECT SIZE WILL AN ADDED VALUE OF NEG $160,000. 10-20-2008 PEP" This extensive remodel project in the foothills area is to include the removal of and placement of select interior partitions to reconfigure the kitchen area and the master suite area including the master bath. There will be exterior walls opened up with larger door window area with lateral design attached. The existing exterior balconies will be repaired / replaced per plan. The existing wooden retaining wall will be replaced with a new keystone type wall with minimal earth disturbance i.e. the ESC plan waiver approval. R-1B ok per Lucinda Grames. Separate electrical, plumbing, ESC and mechanical permits are required. All per the approved plans as marked Engineering calculations and the Engineer's details along with the plan review notes. pep
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Aging Inspection3/17/20103/17/20103/17/2010 PASS
DetailsDave Hannah
DOC - Permit Expired3/17/20103/17/20103/17/2010PPASS
DetailsDave Hannah
Every permit issued by the building official under these provisions shall expire by limitation and become null and void if the work authorized by such permit is not commenced within 180 days from the date of such permit, or if the work authorized by such permit is suspended or abandoned at any time after the work is commenced for a period of 180 days. Before such work can be recommenced, a new permit shall be first obtained, and the fee therefor shall be one-half the amount required for a new permit for such work, provided no changes have been made or will be made in the original plans and specifications for such work, and provided further that such suspension or abandonment has not exceeded one year. In order to renew action on a permit after expiration, the permittee shall pay a new full permit fee.
BLD-Aging Inspection1/13/20101/13/20101/13/2010 PASS
DetailsDave Hannah
c/n on site
BLD-Energy code compliance11/19/200811/20/200811/20/2008PPASS
DetailsDave Hannah
Scheduled by a contractor via Hello! on 11/19/2008 at 12:46:44 PM. Contact: ###-####.
BLD-Framing/Rough-in11/18/200811/19/200811/19/2008APART
DetailsDave Hannah
Scheduled by a contractor via Hello! on 11/18/2008 at 11:17:13 AM. Contact: ###-####. ok to insulate need o fire block