Permit Information
Permit NumberBLD08-01848
StatusFinaled
Name HC COMPANY INC
Site Address 701 E MORRISON KNUDSEN DR
Project NameMK PLAZA II - 1ST FLR STE 104
Customer Number 
ePlanReviewNo
Description
(CONSULATE OF MEXICO) To build-out an existing 5,378 sq. ft. portion of the 1st floor, created under BLD04-01906, for use as an administrative office & support for the Consulate of Mexico. Work includes construction of interior non-combustible fire-resistive walls to create an assembly waiting area, reception / service counters, offices, storage and work areas; to install new 90 minute, 450 degree temperature rated, fire door/frame assembly into the existing 2-hour exit passageway and infill created openings with 2-hour fire rated construction; construct 1-hour fire barriers around Storage Rooms 112 & 117 as incidental use area, with 45-minute fir rated, self-closing door/frame assemblies; install accessible door hardware on all new doors and doors that serve this tenant space as part of the access / egress system; install panic or fire hardware on all doors serving the assembly waiting area as the required exit access and exits; upgrade electrical, mechanical, plumbing and alarm systems per tenant needs and in compliance with codes; install suspended ceiling system, millwork and finishes, all per the reviewed plans, red-lined conditions there-on and all attached plan review conditions of all reviewing agencies. drs
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Final4/9/20094/10/20094/10/2009PPASS
DetailsDave Hannah
Please call one 1/2 hour upon inspection, thanks. Phone #: ###-#### Internet Inspection Request from: Darren Gossett ok for perm occ
FIRE-Final Inspection4/9/20094/10/20094/10/2009APASS
DetailsForrest France
Correction items verified for completion, fire life safety finaled.
FIRE-Final Inspection4/8/20094/9/20094/9/2009AFAIL
DetailsForrest France
Need to post max. occupant load sign per review notes, provide the fire extinguisher at location on wall per plan, relocate one exit sign at the SE corridor away from the horn strobe.
FIRE-Conference4/8/20094/8/20094/8/2009PDONE
DetailsForrest France
Regarding site fire alarm work inspection schedule.
BLD-Other3/18/20093/19/20093/20/2009APART
DetailsDave Hannah
Scheduled by a contractor via Hello! on 3/18/2009 at 1:44:50 PM. Contact: ###-####.ok to cover ceilings
BLD-Other2/17/20092/18/20092/19/2009APART
DetailsDave Hannah
Scheduled by a contractor via Hello! on 2/17/2009 at 1:18:02 PM. fire blocking for curton wall around out side wall at second floor ok to cover
BLD-Framing/Rough-in2/5/20092/6/20092/6/2009APART
DetailsDave Hannah
Scheduled by a contractor via Hello! on 2/5/2009 at 3:46:58 PM. Contact: ###-####.ok to cover 1hr fire wall around duct work
BLD-Framing/Rough-in1/22/20091/23/20091/23/2009APART
DetailsDave Hannah
Scheduled by a contractor via Hello! on 1/22/2009 at 12:29:11 PM. Contact: ###-####.ok to start covering ext walls