Information based on query as of Wednesday, July 17, 2024.
Permit Information
Permit NumberBLD08-01981
StatusFinaled
Name AEI
Site Address 851 W FRONT ST Unit: 906
Project NameTHE ASPEN - UNIT 906
Customer Number 
ePlanReviewNo
Description
(THE ASPEN - RESIDENTIAL UNIT 906) Fire sprinklers required because this building is a high-rise. To create a 524 square foot dwelling unit on the 9th story of a new high-rise building. The 1-hr corridor on this story will be constructed in conjunction with this permit. Work is to include 1-hr fire-resistance-rated tenant demising walls, 1-hr fire-resistance-rated corridor, interior nonbearing walls, suspended gypsum board ceilings, millwork, and finishes. This dwelling unit is required to comply with ICC/ANSI A117.1-2003 Section 1004 as a Type B dwelling unit. The work is required to comply with the approved drawings, with the plan review report, and with all applicable codes and ordinances. The fire sprinkler system is required to comply with NFPA 13 as regulated by the Fire Department. **CJW**
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Final4/30/20095/1/20095/1/2009PPASS
DetailsDave Hannah
Jim Phone #: ###-####ok after fire finals
FIRE-Final Inspection4/30/20095/1/20095/1/2009APASS
DetailsForrest France
Project related fire sprinkler permit has been issued and finaled, fire life safety inspection completed satisfactory.
BLD-Final4/29/20094/30/20095/1/2009PPART
DetailsDave Hannah
Brad Phone #: ###-#### ok after fire finals
FIRE-Final Inspection4/29/20094/30/20094/30/2009ANR
DetailsForrest France
Brad life safety Phone #: ###-####
BLD-Final4/28/20094/29/20094/29/2009PCANC
DetailsDave Hannah
Brad Phone #: ###-####
FIRE-Final Inspection4/28/20094/29/20094/29/2009ANR
DetailsForrest France
Project attatched fire sprinkler permit is still "under review", need to issue and final FIR permits prior to BLD final life safety signature.