Permit Information
Permit NumberBLD08-02036
StatusFinaled
Name MC CONSTRUCTION MANAGEMENT
Site Address 1085 N MILWAUKEE ST
Project NameMARKETPLACE SUB
Customer Number 
ePlanReviewNo
Description
(JOANN FABRICS) Remodel an existing 37,201 sq. ft. tenant space for new tenant. Work includes select interior structural & non-structural demolition. Construct new walls to create private offices, new HIS & HERS accessible restrooms, storage and freight dock areas. To add structural bracing at bottom of trusses per plans; add concrete at two existing footings; support at new openings in roof deck for new HVAC, all per engineering sheets. Work includes upgrade of electrical, mechanical, plumbing, sprinkler and alarm systems; add new interior finishes, accessible drinking fountains and doors / door hardware for code compliance. Installation & anchorage of display shelving. All attached plan reviews and notes added to plans by agency reviewers shall be considered as part of the approved plans requiring full compliance as a part of permit scope of work. NOTE: This building is fully fire sprinklered for area increase. drs
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Final2/17/20092/17/20092/17/2009PPASS
DetailsMike Jordan
ok for perm occ.
BLD-Final2/16/20092/17/20092/17/2009ACANC
DetailsMike Jordan
Scheduled by a contractor via Hello! on 2/16/2009 at 9:25:21 AM. Contact: ###-####.
FIRE-Final Inspection2/16/20092/17/20092/17/2009APASS
DetailsForrest France
Fire life safety completed satisfactory, inspection passed.
BLD-Final2/12/20092/13/20092/13/2009PCANC
DetailsMike Jordan
Scheduled by a contractor via Hello! on 2/12/2009 at 4:50:13 PM. Contact: ###-####. Disp set to [CANC] by a contractor via Hello! on Feb 13 2009 7:50AM.
FIRE-Final Inspection2/12/20092/13/20092/13/2009PCANC
DetailsTroy Cobbley
Scheduled by a contractor via Hello! on 2/12/2009 at 4:49:30 PM. Contact: ###-####. Disp set to [CANC] by a contractor via Hello! on Feb 13 2009 7:49AM.
FIRE-Final Inspection2/4/20092/6/20092/6/2009ACANC
DetailsTroy Cobbley
No inspection was performed due to the project related fire alarm not being complete.
BLD-Final2/4/20092/6/20092/6/2009ANR
DetailsTom Arcoraci
Scheduled by a contractor via Hello! on 2/4/2009 at 2:34:55 PM. Contact: ###-####.
BLD-Other1/26/20091/27/20091/27/2009APASS
DetailsMike Jordan
Scheduled by a contractor via Hello! on 1/26/2009 at 5:55:14 PM. Contact: ###-####. Fixture anchoring ok.
BLD-Other1/23/20091/26/20091/26/2009APASS
DetailsMike Jordan
Scheduled by a contractor via Hello! on 1/23/2009 at 2:10:17 PM. Contact: ###-####.
FIRE-Conference1/23/20091/26/20091/26/2009ADONE
DetailsTroy Cobbley
Scheduled by a contractor via Hello! on 1/23/2009 at 2:13:07 PM. Contact: ###-####.
BLD-Conference1/14/20091/15/20091/15/2009APASS
DetailsMike Jordan
Scheduled by a contractor via Hello! on 1/14/2009 at 3:26:13 PM. Contact: ###-####.
BLD-Framing/Rough-in12/8/200812/9/200812/9/2008APART
DetailsMike Jordan
Scheduled by a contractor via Hello! on 12/8/2008 at 4:19:25 PM. Contact: ###-####. Hat channel for furout on existing masonry walls ok. Also reveiwed special insp. reports for welding, conc. and epoxy. Allreports noted that areas inspected were in compliance.
BLD-Conference11/6/200811/7/200811/7/2008APASS
DetailsMike Jordan
Scheduled by a contractor via Hello! on 11/6/2008 at 4:01:33 PM. Contact: ###-####.