BLD-Conference | 4/2/2010 | 4/2/2010 | 4/5/2010 | A | PASS |
Dave Hannah
|
|
|
they will go get cc
|
FIRE-Final Inspection | 2/2/2010 | 2/2/2010 | 2/2/2010 | P | PASS |
Forrest France
|
|
|
Fire life safety finaled, see previous activity notes.
|
BLD-Final | 12/30/2008 | 12/30/2008 | 12/30/2008 | P | PASS |
Dave Hannah
|
|
|
levi Phone #: ###-#### ok for perm occ
|
BLD-Final | 12/3/2008 | 12/4/2008 | 12/4/2008 | A | PART |
Dave Hannah
|
|
|
levi - as early as possible please Phone #: ###-#### ok for temp occ ok for perm occ after plumbing gos perm
|
FIRE-Final Inspection | 12/2/2008 | 12/3/2008 | 12/3/2008 | A | PASS |
Forrest France
|
|
|
Fire life safety inspection passed.
|
BLD-Final | 11/28/2008 | 12/1/2008 | 12/1/2008 | P | DONE |
Dave Hannah
|
|
|
Levi Phone #: ###-####-cancel per phone call 12-1-08 @ 12:07pm B_S
|
FIRE-Conference | 11/7/2008 | 11/7/2008 | 11/7/2008 | P | DONE |
Forrest France
|
|
|
Regarding modifications to the existing building fire alarm system necessary due to tenant remodel work.
|
BLD-Framing/Rough-in | 11/6/2008 | 11/6/2008 | 11/7/2008 | P | PASS |
Dave Hannah
|
|
|
levi - close to 5:00 if possible Phone #: ###-####
|