Information based on query as of Sunday, June 30, 2024.
Permit Information
Permit NumberBLD08-02107
StatusFinaled
Name RAINIER CONSTRUCTION
Site Address 2233 N LONGVIEW PL
Project Name 
Customer Number 
ePlanReviewNo
Description
"12-10-2008 THIS PROJECT IS MODIFIED TO REFLECT THE PLACEMENT OF ABOUT 33 L.F. OF NEW FOOTING AND FOUNDATION IN THE EXISTING CRAWL AREA TO ALLOW FOR THE ADDITION OF 224S.F. OF BASEMENT AREA. AS THE CONTRACTOR IS TRYING TO UTILIZE THE EXCAVATED EARTH FOR LANDSCAPING AND FILL AN ESC PERMIT IS NOT REQUIRED. ADDED VALUE FOR THIS PERMIT IS $15,000.00 12-10-2008 PEP" This interior remodel project is mainly for the remodel of the master suite and select interior partition work per the plans as noted. There may also be new windows at the exterior. R-1 A ok per Colleen Carroll. Engineering not required as pre-existing foundation will be utilized. Separate electrical, plumbing, and mechanical and ESC permits are required ESc plan waiver approved. All per the approved plans as marked and the plan review notes. No hillside required. pep
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Final7/22/20097/24/20097/24/2009APASS
DetailsMike Jordan
Ernie Phone #: ###-####
DOC - Permit Finaled7/24/20097/24/20097/24/2009PPASS
DetailsMike Jordan
Letter of compliance issued.
BLD-Final6/4/20096/5/20096/5/2009APART
DetailsTony Young
ernie Phone #: ###-####
on site conf,, need #s,, hand and guard rails, landing
BLD-Conference2/9/20092/10/20092/10/2009APASS
DetailsTony Young
Ernie Phone #: ###-####
ok to cover all now
BLD-Energy code compliance2/3/20092/4/20092/4/2009APART
DetailsTony Young
ernie Phone #: ###-####
they added 2 fireplaces after frame and mechanical rough inspections, energy code ok,, ok to cover except by fireplaces,,, need permits for f/p and rough in inspections for both units
BLD-Framing/Rough-in2/2/20092/2/20092/2/2009PPART
DetailsTony Young
ernie Phone #: ###-####
ok after mech pass
BLD-Foundation12/22/200812/23/200812/23/2008APASS
DetailsTony Young
GREG Phone #: ###-####
basement wall ok when ready
BLD-Footing12/19/200812/19/200812/19/2008PPASS
DetailsTony Young
###-#### - greg
basement add ftgs
BLD-Conference10/16/200810/17/200810/17/2008APASS
DetailsTony Young
Scheduled via mobile device. Phone #: 8304054
under floor of slab cover ok to cover
BLD-Foundation10/8/200810/9/200810/9/2008APASS
DetailsTony Young
gregg Phone #: ###-####
BLD-Footing10/6/200810/7/200810/7/2008APASS
DetailsTony Young
greg Phone #: ###-####
new ftgs by entry