FIRE-Final Inspection | 5/19/2010 | 5/19/2010 | 5/21/2010 | A | PASS |
Forrest France
|
|
|
See previous activity notes.
|
FIRE-Final Inspection | 8/10/2009 | 8/10/2009 | 8/10/2009 | A | PASS |
Forrest France
|
|
|
Fire life safety final okayed.
|
BLD-Final | 5/21/2009 | 5/22/2009 | 5/22/2009 | A | PASS |
Tom Arcoraci
|
|
|
rick Phone #: ###-####
|
FIRE-Final Inspection | 5/14/2009 | 5/15/2009 | 5/15/2009 | A | PASS |
Forrest France
|
|
|
rick Phone #: ###-####
|
FIRE-Final Inspection | 4/24/2009 | 4/27/2009 | 4/27/2009 | A | FAIL |
Forrest France
|
|
|
Door hardware at the mail room and conference room B-316 need repair, missing max occupant load sign at the sawtooth conference room, post directional signage per red lines on approved plan set, door closure may be needed at the second exit door from room B-316.
|
BLD-Other | 3/9/2009 | 3/10/2009 | 3/10/2009 | A | PART |
Dave Hannah
|
|
|
Rick- ceiling Phone #: ###-#### ok to cover ceilings in conf. rooms
|
BLD-Framing/Rough-in | 2/24/2009 | 2/25/2009 | 2/26/2009 | A | PART |
Dave Hannah
|
|
|
rick Phone #: ###-#### wall spliting room in half ok
|
BLD-Wall cover | 1/16/2009 | 1/20/2009 | 1/20/2009 | A | PART |
Dave Hannah
|
|
|
Scheduled by a contractor via Hello! on 1/16/2009 at 7:33:35 AM. Contact: ###-####. ok to cover ceiling grid
|
BLD-Wall cover | 12/17/2008 | 12/18/2008 | 12/18/2008 | A | PASS |
Dave Hannah
|
|
|
Scheduled by a contractor via Hello! on 12/17/2008 at 9:50:06 AM. Contact: ###-####. ok to cover wall
|