BLD-Final | 9/15/2009 | 9/15/2009 | 9/15/2009 | P | PASS |
Mike Jordan
|
|
|
Scheduled by a contractor via Hello! on 9/15/2009 at 7:17:08 AM.
|
DOC - Permit Finaled | 9/15/2009 | 9/15/2009 | 9/15/2009 | P | PASS |
Mike Jordan
|
|
|
Cert. of occ was issued.
|
BLD-Other | 4/23/2009 | 4/23/2009 | 4/23/2009 | P | PASS |
Mike Jordan
|
|
|
Scheduled by a contractor via Hello! on 4/23/2009 at 10:28:11 AM. Verified installation of exterior weather barrier.
|
BLD-Energy code compliance | 4/10/2009 | 4/13/2009 | 4/13/2009 | A | PASS |
Mike Jordan
|
|
|
Jim Phone #: ###-####
|
BLD-Framing/Rough-in | 4/9/2009 | 4/9/2009 | 4/9/2009 | P | PASS |
Mike Jordan
|
|
|
Scheduled by a contractor via Hello! on 4/9/2009 at 7:56:05 AM.
|
BLD-Framing/Rough-in | 3/25/2009 | 3/25/2009 | 3/25/2009 | P | PASS |
Mike Jordan
|
|
|
jim -sheetrock eve protection Phone #: ###-####Verified double layer 5/8 type x rock at soffitts. Also inspected nailing for both layers of 5/8 type x rock from ceiling to underside of roof deck.
|
BLD-Framing/Rough-in | 3/23/2009 | 3/23/2009 | 3/23/2009 | P | NR |
Mike Jordan
|
|
|
Jim Phone #: ###-####
|
BLD-Framing/Rough-in | 3/20/2009 | 3/20/2009 | 3/20/2009 | P | PASS |
Mike Jordan
|
|
|
Jim Phone #: ###-####. Nailing on both layers of 5/8 type x rock fro 2hr. fire wall from ceiling to underside of roof deck.
|
BLD-Framing/Rough-in | 3/19/2009 | 3/19/2009 | 3/19/2009 | P | NR |
Mike Jordan
|
|
|
Scheduled by a contractor via Hello! on 3/19/2009 at 7:02:24 AM. Contact: ###-####.
|
BLD-Framing/Rough-in | 3/18/2009 | 3/18/2009 | 3/18/2009 | P | PASS |
Mike Jordan
|
|
|
Scheduled by a contractor via Hello! on 3/18/2009 at 6:23:00 AM. Contact: ###-####. Nailing for both layers of 5/8 type for 2hr. fire walls at overbuild areas. Also verified fire rated plywood for laydown parapets at overbuild areas.
|
BLD-Framing/Rough-in | 3/12/2009 | 3/13/2009 | 3/13/2009 | A | NR |
Mike Jordan
|
|
|
Scheduled by a contractor via Hello! on 3/12/2009 at 8:39:01 PM. Contact: ###-####.
|
BLD-Framing/Rough-in | 3/11/2009 | 3/11/2009 | 3/11/2009 | P | PASS |
Mike Jordan
|
|
|
Scheduled by a contractor via Hello! on 3/11/2009 at 7:19:06 AM. Contact: ###-####. 2nd. floor, 2nd layer of 5/8 type x rock both sides. ok.
|
BLD-Framing/Rough-in | 3/10/2009 | 3/10/2009 | 3/10/2009 | P | NR |
Mike Jordan
|
|
|
Jim Phone #: ###-####
|
BLD-Framing/Rough-in | 3/9/2009 | 3/9/2009 | 3/10/2009 | P | CANC |
Mike Jordan
|
|
|
Scheduled by a contractor via Hello! on 3/9/2009 at 6:52:46 AM. Contact: ###-####.
|
BLD-Framing/Rough-in | 3/6/2009 | 3/9/2009 | 3/9/2009 | A | NR |
Mike Jordan
|
|
|
Jim Phone #: ###-####
|
BLD-Framing/Rough-in | 3/6/2009 | 3/6/2009 | 3/6/2009 | P | PASS |
Mike Jordan
|
|
|
Jim Phone #: ###-####. 2nd. floor, 2nd. layer of 5/8 type x rock for, both sides for 2hr. fire wall.
|
BLD-Framing/Rough-in | 3/5/2009 | 3/5/2009 | 3/5/2009 | P | NR |
Mike Jordan
|
|
|
jim Phone #: ###-####
|
BLD-Framing/Rough-in | 3/4/2009 | 3/4/2009 | 3/4/2009 | P | PASS |
Mike Jordan
|
|
|
Scheduled by a contractor via Hello! on 3/4/2009 at 7:06:24 AM. 2nd. floor, 1st. layer, both sides of 5/8 type x rock for 2hr. fire wall.
|
BLD-Framing/Rough-in | 3/3/2009 | 3/3/2009 | 3/3/2009 | P | NR |
Mike Jordan
|
|
|
Scheduled by a contractor via Hello! on 3/3/2009 at 7:30:50 AM. Contact: ###-####.
|
BLD-Framing/Rough-in | 3/2/2009 | 3/2/2009 | 3/2/2009 | P | PASS |
Mike Jordan
|
|
|
jim Phone #: ###-####. 1st. floor, 2nd layer of 5/8 type x rock, both sides for 2hr. fire wall.
|
BLD-Framing/Rough-in | 2/27/2009 | 2/27/2009 | 2/27/2009 | P | PASS |
Mike Jordan
|
|
|
Scheduled by a contractor via Hello! on 2/27/2009 at 9:17:51 AM. Contact: ###-####. 1st. floor, 1st. layer, remaining side of type x rock for 2hr. fire wall. ok
|
BLD-Framing/Rough-in | 2/26/2009 | 2/26/2009 | 2/26/2009 | P | PART |
Mike Jordan
|
|
|
Jim Phone #: ###-####. 1st. floor, 1st. layer of 5/8 type x rock, one side for 2hr. fire wall.
|
BLD-Framing/Rough-in | 2/24/2009 | 2/25/2009 | 2/26/2009 | P | CANC |
Mike Jordan
|
|
|
Jim Phone #: ###-####
|
BLD-Framing/Rough-in | 2/23/2009 | 2/24/2009 | 2/24/2009 | P | NR |
Mike Jordan
|
|
|
Jim This inspection is for the fire wall Phone #: ###-####
|
BLD-Framing/Rough-in | 2/23/2009 | 2/23/2009 | 2/23/2009 | P | NR |
Mike Jordan
|
|
|
jim Phone #: ###-####
|
BLD-Footing | 2/16/2009 | 2/17/2009 | 2/17/2009 | A | PASS |
Mike Jordan
|
|
|
Scheduled by a contractor via Hello! on 2/16/2009 at 3:09:16 PM. Contact: ###-####. Interior footings ok.
|
BLD-Energy code compliance | 2/11/2009 | 2/12/2009 | 2/12/2009 | P | PASS |
Mike Jordan
|
|
|
Jim Phone #: ###-#### Please call before going out. Rigid foam insul. at interior side of stemwalls.
|
BLD-Foundation | 2/4/2009 | 2/5/2009 | 2/5/2009 | P | PASS |
Mike Jordan
|
|
|
Scheduled by a contractor via Hello! on 2/4/2009 at 8:21:08 AM. Contact: ###-####.
|
BLD-Footing | 2/4/2009 | 2/4/2009 | 2/4/2009 | P | PASS |
Mike Jordan
|
|
|
Scheduled by a contractor via Hello! on 2/4/2009 at 8:20:44 AM. Contact: ###-####.
|