BLD-Final | 7/29/2009 | 7/29/2009 | 7/29/2009 | P | PASS |
Mike Jordan
|
|
|
Scheduled by a contractor via Hello! on 7/29/2009 at 7:56:26 AM.
|
DOC - Permit Finaled | 7/29/2009 | 7/29/2009 | 7/29/2009 | P | PASS |
Mike Jordan
|
|
|
Cert of occ. issued.
|
BLD-Final | 7/23/2009 | 7/23/2009 | 7/23/2009 | P | NR |
Mike Jordan
|
|
|
Scheduled by a contractor via Hello! on 7/23/2009 at 10:14:43 AM. Neds zoning final. Everything ok.
|
BLD-Other | 4/23/2009 | 4/23/2009 | 4/23/2009 | P | PASS |
Mike Jordan
|
|
|
Scheduled by a contractor via Hello! on 4/23/2009 at 10:29:36 AM. Verified installation of exterior weather barrier.
|
BLD-Energy code compliance | 4/10/2009 | 4/13/2009 | 4/13/2009 | A | PASS |
Mike Jordan
|
|
|
Jim Phone #: ###-####
|
BLD-Framing/Rough-in | 4/9/2009 | 4/9/2009 | 4/9/2009 | P | PASS |
Mike Jordan
|
|
|
Scheduled by a contractor via Hello! on 4/9/2009 at 7:58:49 AM.
|
BLD-Other | 4/2/2009 | 4/2/2009 | 4/2/2009 | A | PASS |
Mike Jordan
|
|
|
Scheduled by a contractor via Hello! on 4/2/2009 at 6:00:26 AM. Verified installation of /8 type x rock at soffits.
|
BLD-Framing/Rough-in | 3/23/2009 | 3/23/2009 | 3/23/2009 | P | NR |
Mike Jordan
|
|
|
Jim Phone #: ###-####
|
BLD-Framing/Rough-in | 3/20/2009 | 3/20/2009 | 3/20/2009 | P | PASS |
Mike Jordan
|
|
|
Jim Phone #: ###-####. nailing on both layers of 5/8 type x rock from ceiling to underneath of roof deck for 2hr. fire wall.
|
BLD-Footing | 3/19/2009 | 3/19/2009 | 3/19/2009 | P | CANC |
Mike Jordan
|
|
|
Scheduled by a contractor via Hello! on 3/19/2009 at 7:04:50 AM. Contact: ###-####.
|
BLD-Framing/Rough-in | 3/18/2009 | 3/18/2009 | 3/18/2009 | P | PASS |
Mike Jordan
|
|
|
Scheduled by a contractor via Hello! on 3/18/2009 at 6:25:34 AM. Contact: ###-####. Nailing on both layers of 5/8 type x rock at overbuild areas. Also verified fire rated plywood for laydown parapet at overbuild areas.
|
BLD-Framing/Rough-in | 3/12/2009 | 3/13/2009 | 3/13/2009 | A | NR |
Mike Jordan
|
|
|
Scheduled by a contractor via Hello! on 3/12/2009 at 8:40:59 PM. Contact: ###-####.
|
BLD-Framing/Rough-in | 3/11/2009 | 3/11/2009 | 3/11/2009 | P | NR |
Mike Jordan
|
|
|
Scheduled by a contractor via Hello! on 3/11/2009 at 7:22:34 AM. Contact: ###-####.
|
BLD-Framing/Rough-in | 3/10/2009 | 3/10/2009 | 3/10/2009 | P | PASS |
Mike Jordan
|
|
|
Jim Phone #: ###-####. 2nd. floor, 2nd. layer of 5/8 type x rock, both sides ok.
|
BLD-Framing/Rough-in | 3/9/2009 | 3/9/2009 | 3/10/2009 | P | CANC |
Mike Jordan
|
|
|
Scheduled by a contractor via Hello! on 3/9/2009 at 6:56:17 AM. Contact: ###-####.
|
BLD-Framing/Rough-in | 3/6/2009 | 3/9/2009 | 3/9/2009 | A | NR |
Mike Jordan
|
|
|
Jim Phone #: ###-####
|
BLD-Framing/Rough-in | 3/6/2009 | 3/6/2009 | 3/6/2009 | P | PASS |
Mike Jordan
|
|
|
Jim Phone #: ###-####. 2nd floor, 2nd layer of 5/8 type x rock both sides, for 2hr. fire wall ok.
|
BLD-Framing/Rough-in | 3/5/2009 | 3/5/2009 | 3/5/2009 | P | NR |
Mike Jordan
|
|
|
jim Phone #: ###-####
|
BLD-Framing/Rough-in | 3/4/2009 | 3/4/2009 | 3/4/2009 | P | PASS |
Mike Jordan
|
|
|
Scheduled by a contractor via Hello! on 3/4/2009 at 7:08:27 AM. Contact: ###-####. 2nd. floor, 1st. layer of 5/8 type x rock, both sides.
|
BLD-Framing/Rough-in | 3/3/2009 | 3/3/2009 | 3/3/2009 | P | NR |
Mike Jordan
|
|
|
Scheduled by a contractor via Hello! on 3/3/2009 at 7:33:52 AM. Contact: ###-####.
|
BLD-Framing/Rough-in | 3/2/2009 | 3/2/2009 | 3/2/2009 | P | PASS |
Mike Jordan
|
|
|
jim Phone #: ###-####. 1st. floor, 2nd. layer of 5/8 type x rock, both sides for 2hr. fire wall.
|
BLD-Framing/Rough-in | 2/27/2009 | 2/27/2009 | 2/27/2009 | P | PART |
Mike Jordan
|
|
|
Scheduled by a contractor via Hello! on 2/27/2009 at 9:19:44 AM. Contact: ###-####. 1st. floor, 1st layer of 5/8 type x rock on remaining side for 2hr. wall. ok.
|
BLD-Framing/Rough-in | 2/26/2009 | 2/26/2009 | 2/26/2009 | P | PART |
Mike Jordan
|
|
|
Jim Phone #: ###-####. 1st. floor, 1st. layer of 5/8 type x rock, one side only for 2hr. fire barrier wall.
|
BLD-Framing/Rough-in | 2/24/2009 | 2/25/2009 | 2/26/2009 | P | CANC |
Mike Jordan
|
|
|
Jim Phone #: ###-####
|
BLD-Framing/Rough-in | 2/23/2009 | 2/24/2009 | 2/24/2009 | P | NR |
Mike Jordan
|
|
|
Jim This inspection is for the fire wall Phone #: ###-####
|
BLD-Framing/Rough-in | 2/23/2009 | 2/23/2009 | 2/23/2009 | P | NR |
Mike Jordan
|
|
|
jim Phone #: ###-####
|
BLD-Footing | 2/16/2009 | 2/17/2009 | 2/17/2009 | A | PASS |
Mike Jordan
|
|
|
Scheduled by a contractor via Hello! on 2/16/2009 at 3:11:22 PM. Contact: ###-####. Interior footings ok.
|
BLD-Energy code compliance | 2/11/2009 | 2/12/2009 | 2/12/2009 | A | PASS |
Mike Jordan
|
|
|
Jim Please call before going out Phone #: ###-####. Rigid foam insul. on interior side of stemwall.
|
BLD-Foundation | 2/4/2009 | 2/5/2009 | 2/5/2009 | P | PASS |
Mike Jordan
|
|
|
Scheduled by a contractor via Hello! on 2/4/2009 at 8:24:49 AM. Contact: ###-####.
|
BLD-Footing | 2/4/2009 | 2/4/2009 | 2/4/2009 | P | PASS |
Mike Jordan
|
|
|
Scheduled by a contractor via Hello! on 2/4/2009 at 8:24:30 AM. Contact: ###-####.
|