BLD-Final | 6/17/2009 | 6/17/2009 | 6/17/2009 | P | PASS |
Mike Jordan
|
|
|
Scheduled by a contractor via Hello! on 6/17/2009 at 7:35:48 AM.
|
DOC - Permit Finaled | 6/17/2009 | 6/17/2009 | 6/17/2009 | P | PASS |
Mike Jordan
|
|
|
Cert. of Occ. issued.
|
BLD-Final | 6/12/2009 | 6/12/2009 | 6/12/2009 | P | NR |
Dave Hannah
|
|
|
Jim Phone #: ###-#### needs mec final first
|
BLD-Other | 4/16/2009 | 4/16/2009 | 4/16/2009 | P | CANC |
Mike Jordan
|
|
|
Scheduled by a contractor via Hello! on 4/16/2009 at 8:25:08 AM. Contractor called in wrong unit.
|
BLD-Other | 4/14/2009 | 4/14/2009 | 4/14/2009 | P | PASS |
Mike Jordan
|
|
|
Jim- ###-####- building wrap. Verified installation of exterior weather barrier.
|
BLD-Other | 4/10/2009 | 4/10/2009 | 4/10/2009 | P | PART |
Mike Jordan
|
|
|
Jim- house wrap Phone #: ###-####. Installation of exterior weather barrier.
|
BLD-Energy code compliance | 3/31/2009 | 3/31/2009 | 3/31/2009 | P | PASS |
Mike Jordan
|
|
|
Jim Phone #: ###-####. ok to cover.
|
BLD-Energy code compliance | 3/30/2009 | 3/30/2009 | 3/30/2009 | P | NR |
Mike Jordan
|
|
|
jim Phone #: ###-####
|
BLD-Framing/Rough-in | 3/27/2009 | 3/27/2009 | 3/27/2009 | P | PASS |
Mike Jordan
|
|
|
Scheduled by a contractor via Hello! on 3/27/2009 at 8:10:47 AM. Contact: ###-####. ok to insul.
|
BLD-Framing/Rough-in | 3/6/2009 | 3/9/2009 | 3/9/2009 | A | NR |
Mike Jordan
|
|
|
Jim Phone #: ###-####
|
BLD-Framing/Rough-in | 3/6/2009 | 3/6/2009 | 3/6/2009 | P | NR |
Mike Jordan
|
|
|
Jim Phone #: ###-####
|
BLD-Framing/Rough-in | 3/5/2009 | 3/5/2009 | 3/5/2009 | P | PASS |
Mike Jordan
|
|
|
jim Phone #: ###-####. 2nd floor, 2nd. layer of 5/8 type xrock, both sides for 2hr. fire wall. ok.
|
BLD-Framing/Rough-in | 3/4/2009 | 3/4/2009 | 3/4/2009 | P | PASS |
Mike Jordan
|
|
|
Scheduled by a contractor via Hello! on 3/4/2009 at 7:03:22 AM. Contact: ###-####. 2nd. floor, 1st. layer, both sides, 5/8 type x rock for 2hr. wall.
|
BLD-Framing/Rough-in | 3/3/2009 | 3/3/2009 | 3/3/2009 | P | NR |
Mike Jordan
|
|
|
Scheduled by a contractor via Hello! on 3/3/2009 at 7:26:54 AM. Contact: ###-####.
|
BLD-Framing/Rough-in | 3/2/2009 | 3/2/2009 | 3/2/2009 | P | PASS |
Mike Jordan
|
|
|
jim Phone #: ###-####. Both layers of 5/8 type x rock at overbuild area for 2hr. fire wall.
|
BLD-Framing/Rough-in | 2/27/2009 | 2/27/2009 | 2/27/2009 | P | NR |
Mike Jordan
|
|
|
Scheduled by a contractor via Hello! on 2/27/2009 at 8:21:08 AM. Contact: ###-####.
|
BLD-Framing/Rough-in | 2/24/2009 | 2/25/2009 | 2/26/2009 | P | PASS |
Mike Jordan
|
|
|
Jim Phone #: ###-####. 1st. floor 2nd. layer layer, remainig side 5/8 type x rock for 2hr. wall.
|
BLD-Framing/Rough-in | 2/24/2009 | 2/24/2009 | 2/24/2009 | P | PASS |
Mike Jordan
|
|
|
1st. floor, 1st. layer, remaining side of 5/8 type x rock for 2hr. wall.
|
BLD-Framing/Rough-in | 2/23/2009 | 2/24/2009 | 2/24/2009 | A | PART |
Mike Jordan
|
|
|
Jim This inspection is for the fire wall Phone #: ###-####. 1st. floor, 1st. layer 5/8 type x rock for 2hr. wall, one side only.
|
BLD-Framing/Rough-in | 2/23/2009 | 2/23/2009 | 2/23/2009 | P | NR |
Mike Jordan
|
|
|
jim Phone #: ###-####
|
BLD-Framing/Rough-in | 2/19/2009 | 2/20/2009 | 2/20/2009 | A | CANC |
Mike Jordan
|
|
|
Scheduled by a contractor via Hello! on 2/19/2009 at 9:49:18 PM. Contact: ###-####.
|
BLD-Footing | 2/13/2009 | 2/13/2009 | 2/17/2009 | P | PASS |
Mike Jordan
|
|
|
Scheduled by a contractor via Hello! on 2/13/2009 at 8:23:52 AM. Contact: ###-####. Interior footings ok.
|
BLD-Energy code compliance | 1/29/2009 | 1/29/2009 | 1/29/2009 | P | PASS |
Mike Jordan
|
|
|
Jim Phone #: ###-####. rigid foam insul. on interior side of stemwall. ok.
|
BLD-Foundation | 1/27/2009 | 1/27/2009 | 1/27/2009 | P | PASS |
Mike Jordan
|
|
|
bill Phone #: ###-####
|
BLD-Footing | 1/23/2009 | 1/23/2009 | 1/23/2009 | P | PASS |
Mike Jordan
|
|
|
bill Phone #: ###-####. Perimeter footings.
|