Permit Information
Permit NumberBLD08-02190
StatusFinaled
Name PARADIGM CONSTRUCTION COMPANY LLC
Site Address 8866 W EVENING STAR LN
Project NamePinetree Village
Customer Number 
ePlanReviewNo
Description
(UNIT 1 BUILDING 9) This permit is for the construction of a new townhouse. This is a one level unit of 1051 square feet with two bedrooms and two bathrooms as well as an attached garage of 282 square feet. There is also a covered front porch of 36 square feet. The side setback for this unit is five feet, therefore the roof overhangs will encroach into the fire separation distance and are required to be rated to one hour on the underneath side per the detail on the approved plans. The separation wall is built to the gypsum detail WP 4136. See comments for anchors. R-2D zoning district, building setbacks, CUP07-00150, CUP08-00058, and DRH08-00043 per Planning and Zoning. Built per all approved plans, engineering, red lining, and plan review report. (BSP)
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Final11/2/200911/2/200911/2/2009PPASS
DetailsJim Storey
Jim Phone #: ###-####.
DOC - Permit Finaled11/2/200911/2/200911/2/2009PPASS
DetailsJim Storey
BLD-Other4/23/20094/23/20094/23/2009PPASS
DetailsMike Jordan
Scheduled by a contractor via Hello! on 4/23/2009 at 10:30:09 AM. Verified installation of exterior weather barrier.
BLD-Energy code compliance4/20/20094/20/20094/20/2009APASS
DetailsMike Jordan
Scheduled by a contractor via Hello! on 4/20/2009 at 6:52:11 AM.
BLD-Other4/17/20094/17/20094/17/2009PPASS
DetailsMike Jordan
Scheduled by a contractor via Hello! on 4/17/2009 at 6:54:59 AM. Verified installation of exterior weather barrier.
BLD-Framing/Rough-in4/16/20094/16/20094/16/2009PPASS
DetailsMike Jordan
Jim Phone #: ###-####
BLD-Other4/2/20094/2/20094/2/2009APASS
DetailsMike Jordan
Scheduled by a contractor via Hello! on 4/2/2009 at 6:01:04 AM. Verified installation of the double layer of 5/8 type x rock at soffitt.
BLD-Framing/Rough-in3/26/20093/26/20093/27/2009PPASS
DetailsMike Jordan
firewall construction Phone #: ###-####. fire rated plywood for laydown parapets at overbuilds ok.
BLD-Framing/Rough-in3/25/20093/25/20093/25/2009PPASS
DetailsMike Jordan
jim Phone #: ###-####. Nailing for bot layers of 5/8 type x rock from ceiling to underside of roof deck.
BLD-Framing/Rough-in3/23/20093/23/20093/23/2009PNR
DetailsMike Jordan
Jim Phone #: ###-####
BLD-Framing/Rough-in3/20/20093/20/20093/20/2009PNR
DetailsMike Jordan
Jim Phone #: ###-####
BLD-Framing/Rough-in3/19/20093/19/20093/19/2009PPASS
DetailsMike Jordan
Scheduled by a contractor via Hello! on 3/19/2009 at 6:58:52 AM. Contact: ###-####. 2nd. floor, 2nd. layer of 5/8 type x rock, both sides, for 2hr. firewall.
BLD-Framing/Rough-in3/18/20093/18/20093/18/2009PNR
DetailsMike Jordan
Scheduled by a contractor via Hello! on 3/18/2009 at 6:26:18 AM. Contact: ###-####.
BLD-Framing/Rough-in3/17/20093/17/20093/17/2009PPASS
DetailsMike Jordan
Jim Phone #: ###-####. 2nd. floor, 1st. layer, remaining side of 5/8 type x rock for 2hr. firewall.
BLD-Framing/Rough-in3/16/20093/16/20093/16/2009PPART
DetailsMike Jordan
Scheduled by a contractor via Hello! on 3/16/2009 at 11:14:25 AM. Contact: ###-####. 2nd. floor, 1st. layer, one side only of 5/8 type x rock for 2hr. fire wall.
BLD-Framing/Rough-in3/12/20093/13/20093/13/2009ANR
DetailsMike Jordan
Scheduled by a contractor via Hello! on 3/12/2009 at 8:41:38 PM. Contact: ###-####.
BLD-Framing/Rough-in3/11/20093/11/20093/11/2009PNR
DetailsMike Jordan
Scheduled by a contractor via Hello! on 3/11/2009 at 7:23:32 AM. Contact: ###-####.
BLD-Framing/Rough-in3/10/20093/10/20093/10/2009PNR
DetailsMike Jordan
Jim Phone #: ###-####
BLD-Framing/Rough-in3/9/20093/9/20093/10/2009PCANC
DetailsMike Jordan
Scheduled by a contractor via Hello! on 3/9/2009 at 6:56:55 AM. Contact: ###-####.
BLD-Framing/Rough-in3/6/20093/9/20093/9/2009ANR
DetailsMike Jordan
Jim Phone #: ###-####
BLD-Framing/Rough-in3/6/20093/6/20093/6/2009PPASS
DetailsMike Jordan
Jim Phone #: ###-####. 1st. floor, 2nd layer of 5/8 type x rock, remaining side for 2hr. fire wall.
BLD-Framing/Rough-in3/5/20093/5/20093/5/2009PNR
DetailsMike Jordan
jim Phone #: ###-####
BLD-Framing/Rough-in3/3/20093/4/20093/4/2009APASS
DetailsMike Jordan
Jim Phone #: ###-####. 1st. floor, 1st layer of 5/8 type x rock , remaining side for 2hr. fire wall.
BLD-Framing/Rough-in3/3/20093/3/20093/3/2009PPART
DetailsMike Jordan
Scheduled by a contractor via Hello! on 3/3/2009 at 7:35:00 AM. Contact: ###-####. 1st. floor, 1st. layer of 5/8 type x rock , one side only for 2hr. fire wall.
BLD-Framing/Rough-in3/2/20093/2/20093/2/2009PCANC
DetailsMike Jordan
jim Phone #: ###-####
BLD-Footing2/23/20092/23/20092/23/2009APASS
DetailsMike Jordan
Scheduled by a contractor via Hello! on 2/23/2009 at 6:47:45 AM. Contact: ###-####.
BLD-Footing2/20/20092/20/20092/20/2009PPASS
DetailsMike Jordan
Interior footings ok.
BLD-Energy code compliance1/29/20091/30/20091/30/2009APASS
DetailsMike Jordan
Jim Phone #: ###-####. Rigid foam insul. at interior side of stemwall.
BLD-Foundation1/27/20091/28/20091/28/2009PNR
DetailsMike Jordan
bill Phone #: ###-####
BLD-Footing1/26/20091/26/20091/26/2009PPASS
DetailsMike Jordan
bill Phone #: ###-####