Permit Information
Permit NumberBLD08-02192
StatusFinaled
Name PARADIGM CONSTRUCTION COMPANY LLC
Site Address 8860 W EVENING STAR LN
Project NamePinetree Village
Customer Number 
ePlanReviewNo
Description
(UNIT 2 BUILDING 9) This permit is for the construction of one unit in a new townhouse. The mains story is 691 square feet with one bathroom and an attached garage of 535 square feet. The second story is 589 square feet with three bedrooms and two bathrooms. The front porch is 60 square feet and the separation wall between units is built to gypsum file WP 4136. The walls built on the property line have a fire rating that extends to the roof deck per the detail of page A6.1. See comments for anchors. R-2D zoning district, building setbacks, CUP07-000150, CUP08-00058, and DRH08-00043. Built per all approved plans, engineering, red lining, and plan review report. (BSP)
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Final12/1/200912/1/200912/1/2009PPASS
DetailsMike Jordan
call Jim thanks Phone #: ###-#### Internet Inspection Request from: James Larkin
DOC - Permit Finaled12/1/200912/1/200912/1/2009PPASS
DetailsMike Jordan
Cert. of occ. issued.
BLD-Energy code compliance4/20/20094/20/20094/20/2009APASS
DetailsMike Jordan
Scheduled by a contractor via Hello! on 4/20/2009 at 6:53:22 AM.
BLD-Other4/17/20094/17/20094/17/2009PPASS
DetailsMike Jordan
Scheduled by a contractor via Hello! on 4/17/2009 at 6:55:56 AM.
BLD-Framing/Rough-in4/16/20094/16/20094/16/2009PPASS
DetailsMike Jordan
Jim Phone #: ###-####
BLD-Framing/Rough-in3/26/20093/26/20093/27/2009PPASS
DetailsMike Jordan
firewall construction Phone #: ###-####. fire rated plywood for laydown parapets at overbuilds ok.
BLD-Framing/Rough-in3/25/20093/25/20093/25/2009PPASS
DetailsMike Jordan
jim Phone #: ###-####. Nailing for both layers of 5/8 type x rock from ceiling to underside of roof deck.
BLD-Framing/Rough-in3/23/20093/23/20093/23/2009PNR
DetailsMike Jordan
Jim Phone #: ###-####
BLD-Framing/Rough-in3/20/20093/20/20093/20/2009PNR
DetailsMike Jordan
Jim Phone #: ###-####
BLD-Framing/Rough-in3/19/20093/19/20093/19/2009PPASS
DetailsMike Jordan
Scheduled by a contractor via Hello! on 3/19/2009 at 7:00:31 AM. Contact: ###-####. 2nd. floor, 2nd layer of 5/8 type x rock, both sides for 2hr. firewall.
BLD-Framing/Rough-in3/18/20093/18/20093/18/2009PNR
DetailsMike Jordan
Scheduled by a contractor via Hello! on 3/18/2009 at 6:27:38 AM. Contact: ###-####.
BLD-Framing/Rough-in3/17/20093/17/20093/17/2009PCANC
DetailsMike Jordan
Jim Phone #: ###-####
BLD-Framing/Rough-in3/16/20093/16/20093/16/2009PPASS
DetailsMike Jordan
Scheduled by a contractor via Hello! on 3/16/2009 at 11:15:38 AM. Contact: ###-####. 1st. layer, 2nd floor, both sides of 5/8 type x rock for 2hr. fire wall.
BLD-Framing/Rough-in3/12/20093/13/20093/13/2009ANR
DetailsMike Jordan
Scheduled by a contractor via Hello! on 3/12/2009 at 8:42:57 PM. Contact: ###-####.
BLD-Framing/Rough-in3/11/20093/11/20093/11/2009PNR
DetailsMike Jordan
Scheduled by a contractor via Hello! on 3/11/2009 at 7:25:27 AM. Contact: ###-####.
BLD-Framing/Rough-in3/10/20093/10/20093/10/2009PPASS
DetailsMike Jordan
Jim Phone #: ###-####
BLD-Framing/Rough-in3/9/20093/9/20093/10/2009PCANC
DetailsMike Jordan
Scheduled by a contractor via Hello! on 3/9/2009 at 6:59:17 AM. Contact: ###-####.
BLD-Framing/Rough-in3/6/20093/9/20093/9/2009ANR
DetailsMike Jordan
Jim Phone #: ###-####
BLD-Framing/Rough-in3/6/20093/6/20093/6/2009PPASS
DetailsMike Jordan
Jim Phone #: ###-####. 1st. floor, 2nd layer, both sides of 5/8 type x rock for 2hr. fire wall.
BLD-Framing/Rough-in3/5/20093/5/20093/5/2009PNR
DetailsMike Jordan
jim Phone #: ###-####
BLD-Framing/Rough-in3/3/20093/4/20093/4/2009APASS
DetailsMike Jordan
Jim Phone #: ###-####. 1st. floor, 1st. layer of type x rock, remaining side for 2hr. fire wall.
BLD-Framing/Rough-in3/3/20093/3/20093/3/2009PPART
DetailsMike Jordan
Scheduled by a contractor via Hello! on 3/3/2009 at 7:36:33 AM. Contact: ###-####. 1st. floor, 1st. layer of 5/8 type x rock for 2hr. wall, one side.
BLD-Framing/Rough-in3/2/20093/2/20093/2/2009PCANC
DetailsMike Jordan
jim Phone #: ###-####
BLD-Footing2/23/20092/23/20092/23/2009APASS
DetailsMike Jordan
Scheduled by a contractor via Hello! on 2/23/2009 at 6:48:57 AM. Contact: ###-####.
BLD-Footing2/20/20092/20/20092/20/2009PPASS
DetailsMike Jordan
Interior footings ok.
BLD-Energy code compliance1/29/20091/30/20091/30/2009APASS
DetailsMike Jordan
Jim Phone #: ###-####. Rigid foam insul. at interior side of stemwall ok.
BLD-Foundation1/27/20091/28/20091/28/2009PNR
DetailsMike Jordan
bill Phone #: ###-####
BLD-Footing1/26/20091/26/20091/26/2009PPASS
DetailsMike Jordan
bill Phone #: ###-####